A single fire in a battery or power room can take out every copy of data and every control system that happens to share the building. Three incidents with published investigation findings or official statements show it: the OVHcloud Strasbourg campus in March 2021, the SK C&C Pangyo data centre that hosted Kakao's core services in October 2022, and the National Information Resources Service (NIRS) centre in Daejeon, South Korea, in September 2025. This guide sets out a neutral, sourced timeline for each, then draws the customer-side lessons on backup location, geo-redundancy, battery and UPS risk, and restore testing. It is written for infrastructure, resilience and continuity managers, especially in organisations that still run production and backups from one site. For physical and environmental controls inside a facility, see the Data Centre Security Guide.
Key takeaways
- Same building is not a backup. In all three incidents the data and services that suffered most were those whose copies, or whose control systems, sat in the affected site.
- Batteries change the fire. Two of the three fires started in battery or UPS areas, and the Pangyo investigation found gas suppression could not put out a lithium-ion battery fire.
- Power cut-off decides recovery time. Fighting a fire in electrical plant often needs power isolated, and that shutdown can stop every system in the building, including the redundant ones.
- Control planes need redundancy too. Kakao's verification function, which many of its services relied on, was controlled only at Pangyo, so services that had capacity elsewhere still failed.
- A restore you have not tested is a hope. Only a timed recovery from the off-site copy, into a different site, proves the plan works.
Why fires matter for cyber resilience
Ransomware dominates backup planning, so many designs focus on immutability and isolation of credentials. Fire tests a different assumption: that the hardware holding the "other" copy is physically somewhere else. A ransomware design can pass every logical test and still keep the primary array, the backup appliance and the backup catalogue in one hall. Physical loss also differs from cyber loss in three ways that matter for planning:
- Scope is the building, not the system: every tenant, network device and management server inside the fire compartment or power domain is lost at once.
- Access is denied for days: after the fire, the site may be closed for safety, investigation or decontamination, so "we will recover the disks" is not a plan.
- The provider's recovery is not yours: a hosting provider rebuilds its facility; customer data with no copy elsewhere is not part of that rebuild.
The same lesson applies to cloud regions. See Cloud Region Outage Resilience.
OVHcloud Strasbourg 2021
The fire broke out shortly before 01:00 on 10 March 2021 on OVHcloud's Strasbourg campus, which held four data centres, SBG1 to SBG4. OVHcloud confirmed that nobody was harmed. SBG2, a five-storey building, was destroyed, SBG1 was damaged, and the whole campus was isolated, which interrupted services hosted in all four buildings while SBG3 and SBG4 were brought back.
A report by the Bas-Rhin fire service, published by Journal du Net in March 2022 and summarised by The Register, described an electrical inverter fire that began on the first floor of SBG2. It recorded the fire start at 00:46, the electricity provider arriving at about 01:20 and power being cut at about 03:29. It also noted the absence of an automatic extinguishing system and of an electrical cut-off mechanism, a wooden ceiling rated for one hour of fire resistance, inner courtyards that acted as chimneys, and toxic fumes from lead batteries. OVHcloud had not officially declared a cause when that report was published.
Customer-side lesson: the whole campus was isolated, not just the burning building, so any customer whose servers and backups both sat in Strasbourg had nothing to restore from while it was closed. A copy in another region or with another provider is what allows a rebuild elsewhere.
Kakao Pangyo 2022
On 15 October 2022 a fire started in the battery room on the third basement floor of the SK C&C Pangyo data centre in Gyeonggi Province. It was extinguished at 23:45 the same day. The Ministry of Science and ICT published its investigation on 6 December 2022, as reported by The Korea Herald.
- Cause and spread: lithium-ion batteries were not physically separated from the UPS. Gas extinguishers could not suppress the battery fire, which heated the UPS. Water was not used because the system could not target specific areas.
- Why recovery was slow: the battery fire overheated the UPS, operations were suspended and power was cut, and the ministry's findings, as reported, tied this to the slow recovery. Services resumed in sequence as power returned.
- Single points of failure: most core Kakao functions, including KakaoTalk and Daum, were concentrated in one data centre, and the verification function that many Kakao services depend on was controlled only at Pangyo. Kakao outages lasted more than 11 hours.
- Required actions: the ministry called for core functions to be spread across other data centres, scenario reviews for different emergency types, fire simulation training, detection and extinguishing equipment suited to lithium-ion fires, and physical separation of batteries from other electrical plant.
Customer-side lesson: having servers in more than one site did not help when the shared dependency, here authentication, ran from one site only.
NIRS Daejeon 2025
The NIRS runs data centres for South Korean central government systems. A fire broke out at about 20:16 on 26 September 2025 in room 7-1 of the Daejeon centre during the relocation of lithium-ion UPS batteries, and was fully extinguished at about 18:00 the next day, roughly 22 hours later, according to reporting of the official findings by Asia Economy.
- Systems affected: the Ministry of the Interior and Safety reported that 709 systems were affected. On 30 December 2025 it announced that all 709 had been restored, 95 days after the fire, with the last three recovered through a public-private cloud at the Daegu centre.
- The G-Drive loss: the ministry said the fire destroyed G-Drive, a government cloud storage platform in use since 2018 that gave officials about 30 GB each. Its large-capacity, low-performance storage design did not allow external backup, so work files that about 750,000 civil servants had saved there could not be recovered, as reported by Korea JoongAng Daily. The ministry noted that final reports and official records were also held in a separate records system. Most other Daejeon systems were backed up daily to equipment in the same centre and to a remote facility.
- Cause: the Board of Audit and Inspection announced on 7 September 2026 that only one of eight battery racks had been powered down before dismantling began, and that sparks came from cable terminals that were not properly insulated. The National Forensic Service concluded the main cause was the failure to power down and insulate the battery rack cables. The board also found that dismantling had been passed to firms not registered as electrical contractors and that the agency had not checked who did the work.
- Response: the ministry announced stronger safety standards for public data centres, improved disaster recovery including redundancy and real-time backup, and gradual relocation of the Daejeon centre.
Customer-side lesson: a storage platform designed without an off-site copy turned an outage into permanent loss, while systems that had remote copies came back.
Common lessons
| Lesson | OVHcloud 2021 | Kakao 2022 | NIRS 2025 |
|---|---|---|---|
| Fire origin in power or battery plant | Electrical inverter fire (fire service report); lead batteries noted | Lithium-ion battery room next to UPS | Lithium-ion UPS batteries during relocation |
| Power cut stopped the whole site | Power cut about 3 hours 43 minutes after fire start; campus isolated | Power cut-off named as main cause of slow recovery | Hundreds of systems offline; full recovery after 95 days |
| Single-site dependency | Whole four-building campus isolated | Core functions and authentication concentrated at Pangyo | G-Drive with no external backup |
| What helped | Restart of undamaged SBG3 and SBG4; copies held elsewhere | Services and data held in other centres | Daily backups to a remote facility; recovery via another centre |
- Geography: "off-site" must mean outside the fire compartment, power domain and campus, and in practice outside the city if the threat model includes regional events.
- Battery and UPS work is a high-risk change: the NIRS fire happened during planned battery relocation. Treat UPS and battery maintenance in your own facilities, or ask your provider how it treats it, as a change with fire risk, power isolation steps and verified contractors. See the Battery Energy Storage System Security Guide.
- Dependencies hide in shared services: identity, DNS, key management, monitoring and the backup catalogue are often single-site even when application servers are not.
- Recovery is a capacity problem: restoring hundreds of systems at once needs compute, storage, network and people at the recovery site, which the NIRS timeline shows can take months.
Applying the lessons
Decide the protection level per system
| Pattern | Survives loss of one building | Typical recovery | When to choose it |
|---|---|---|---|
| Backups in the same site (other room or rack) | No | Not possible after site loss | Never as the only copy; acceptable as a fast local restore tier |
| Off-site backup copy (other region, provider or vault) | Yes, data survives | Days, depending on rebuild capacity | Minimum for all business data; suits small organisations with tolerant recovery objectives |
| Warm standby in a second site | Yes | Hours | Important services with recovery time objectives in hours |
| Active-active across sites | Yes | Minutes, if dependencies are also duplicated | Critical customer-facing services and shared control functions such as authentication |
Small organisations usually meet the lesson with an off-site, immutable backup copy at a different provider or region and a documented rebuild plan. Large organisations need the full dependency map and at least warm standby for shared services. See Cloud Disaster Recovery Strategies and The 3-2-1-1-0 Backup Rule Explained.
Step-by-step programme
- Map physical location: for every system and its backup copies, record the building, campus, region and provider. Ask hosting and colocation providers which data hall and power domain hold your equipment and backups.
- Map shared dependencies: list identity providers, DNS, key management, secrets stores, monitoring, backup servers and catalogues, and where each runs.
- Close single-site gaps: move or replicate at least one backup copy and the backup catalogue to a separate site, with separate credentials. See the Backup Identity Isolation Guide.
- Review providers' fire and power design: ask about battery chemistry, separation of battery rooms from UPS and IT space, suppression suited to the battery type, emergency power cut-off and how battery maintenance is controlled. Standards such as ANSI/TIA-942 and EN 50600 give a vocabulary for this. See the ANSI/TIA-942 and EN 50600 Guide.
- Test a site-loss restore: once a year at least, recover a representative set of systems from the off-site copy into a different site, with the primary site treated as unreachable, and time it against the recovery time objective.
- Exercise the scenario: run a tabletop where the primary site is closed for two weeks, including who declares the disaster, how staff reach recovery systems and how customers are told.
- Keep rollback simple: after a failover test, return to the primary site by the documented runbook, and record anything that only worked because someone improvised.
Detection and measurement
- Off-site coverage: percentage of systems with at least one backup copy outside the primary site (target 100 per cent).
- Single-site shared services: count of shared dependencies with no second site (target zero for identity and backup catalogue).
- Site-loss restore result: measured recovery time and recovery point from the last site-loss test, against objectives.
- Test age: days since the last successful off-site restore per critical system.
- Provider assurance: percentage of hosting providers whose fire, power and battery controls have been reviewed in the last year.
Monitor backup replication jobs to the off-site copy and alert on failures or growing lag. See Backup Alerting and Monitoring.
Framework mapping
| Framework | Reference | Link to the lessons |
|---|---|---|
| NIST SP 800-53 Rev. 5 | CP-6 Alternate Storage Site; CP-7 Alternate Processing Site; CP-9 System Backup; CP-4 Contingency Plan Testing | Off-site copies, second site and tested restores |
| NIST SP 800-53 Rev. 5 | PE-11 Emergency Power; PE-13 Fire Protection | UPS, battery and suppression design questions for providers |
| NIST CSF 2.0 | PR.DS-11 backups created, protected, maintained and tested; PR.IR-03 resilience mechanisms; RC.RP-01 recovery plan executed | Backup location, redundancy and recovery execution |
| CIS Controls v8.1 | Control 11 Data Recovery | Isolated recovery data and recovery testing; see the CIS Control 11 Data Recovery Guide |
Common failure patterns
- Backup appliance next to the array: local snapshots and backup storage in the same hall counted as the only recovery copy.
- Unasked provider questions: assuming a hosting provider keeps backups in another site without checking the contract and the actual location.
- Systems designed out of backup: large or low-cost storage platforms excluded from off-site copy because of size or performance, as with G-Drive.
- Single-site control functions: authentication, DNS or management tooling left in one centre while application capacity is spread out, as at Pangyo.
- Unmanaged battery work: UPS and battery maintenance run by unverified contractors without full power isolation, as the NIRS findings describe.
- Restore tests inside the same site: tests that prove files can be read back but not that services can run elsewhere.
Practitioner checklist
- Record the physical site of every system, backup copy and backup catalogue.
- Keep at least one immutable backup copy outside the primary building, campus and power domain.
- Give identity, DNS, key management and backup catalogue a second site.
- Ask each hosting provider about battery type, separation from UPS and IT space, suppression and power cut-off.
- Treat battery and UPS maintenance as high-risk change with verified contractors and full isolation.
- Run a timed site-loss restore into a different site at least yearly.
- Exercise a two-week site closure scenario with business owners.
- Track off-site coverage and test age as resilience metrics.
Standards and references
- The Korea Herald: Ministry of Science and ICT findings on the Kakao outage
- Asia Economy: Board of Audit and Inspection findings on the NIRS fire
- Asia Economy: NIRS fire fully restored after 95 days
- Korea JoongAng Daily: NIRS fire destroys government cloud storage system
- The Register: Fire service report on the OVHcloud Strasbourg fire
- Computer Weekly: OVHcloud confirms no casualties at Strasbourg
- NIST: SP 800-53 Rev. 5
- NIST: Cybersecurity Framework 2.0
Related NHI Mgmt Group resources: Business Continuity and Disaster Recovery Guide · Backup and Recovery Testing Checklist · Cloud Region Outage Resilience · Data Centre Security Guide