Join our Newsletter — 33% off our NHI Course
Home› Guides› Device Support Period Rules in the UK and…
Guide Regulations & Frameworks

Device Support Period Rules in the UK and EU: PSTI, Ecodesign and the Cyber Resilience Act

PDF for newsletter subscribers · free to read online

← All guides
By NHI Mgmt Group, under the editorial direction of Lalit Choda Updated 20 November 2026 12 min read
On this page

Three pieces of law now shape how long connected devices sold in Great Britain and the European Union must receive security updates, and how clearly that period must be stated to buyers. In Great Britain, the Product Security and Telecommunications Infrastructure (PSTI) regime requires manufacturers of connectable products to publish a defined support period. In the EU, the Ecodesign regulation for smartphones and tablets sets a minimum five year update window, and the Cyber Resilience Act (CRA) will require a support period of at least five years for most products with digital elements.

This guide sets out what each instrument requires on support periods specifically, using only the primary legal texts on legislation.gov.uk and EUR-Lex. It does not repeat the full PSTI regime, which is covered in our UK PSTI Act Guide, or the wider CRA, covered in the EU Cyber Resilience Act Guide. Each regime is described in its own section in the order it took effect.

This page is general information, not legal advice. Status as of 20 Nov 2026. Check the current legal texts and take qualified advice before relying on this page for compliance decisions.

Key takeaways

  • The UK PSTI security requirements came into force on 29 April 2024. Manufacturers must publish the defined support period for a relevant connectable product, and it must not be shortened after publication.
  • The EU Ecodesign regulation for smartphones and slate tablets, Regulation (EU) 2023/1670, applies from 20 June 2025 and requires free operating system updates until at least five years after a model's end of placement on the market.
  • The EU Cyber Resilience Act, Regulation (EU) 2024/2847, applies generally from 11 December 2027. It requires a support period of at least five years, unless the product is expected to be in use for less, and the end date must be stated at the time of purchase with at least month and year.
  • Under the CRA, each security update must remain available for at least ten years after issue, or for the remainder of the support period if longer.
  • PSTI is a transparency rule: it sets no minimum length. Ecodesign and the CRA set minimum lengths, with different triggers and scopes.
  • For buyers, the combined effect is that support periods are becoming visible and comparable before purchase, which helps asset, endpoint and identity teams plan replacement and credential retirement.

Support period rules at a glance

ItemUK PSTI Regulations 2023EU Ecodesign Regulation 2023/1670EU Cyber Resilience Act 2024/2847
In force or applies from29 April 2024 (regulation 1)20 June 2025 (Article 10)11 December 2027; Article 14 from 11 September 2026 (Article 71(2))
ProductsRelevant connectable productsSmartphones, other mobile phones, cordless phones, slate tabletsProducts with digital elements
Support period dutyPublish the defined support period (Schedule 1, para 3(2))OS updates to at least 5 years after end of placement on the market (Annex II)At least 5 years, or expected use time if shorter (Article 13(8))
DisclosureClear, free, in English, without request; equal prominence with price on manufacturer's own site (para 3(4) to 3(5))Not addressed in the update provisions reviewedEnd date with at least month and year, at time of purchase (Article 13(19))
ChangesExtension published as soon as practicable; shortening breaches the requirement (para 3(3), 3(6))Not applicableNot reviewed for this page
Update timingNot specifiedSecurity fixes within 4 months, functionality within 6 months of source code releaseNot reviewed for this page

Scope

UK PSTI

The Product Security and Telecommunications Infrastructure (Security Requirements for Relevant Connectable Products) Regulations 2023, SI 2023/1007, set security requirements for relevant connectable products. The detailed scope, including excepted product categories, is explained in our UK PSTI Act Guide and is not repeated here.

EU Ecodesign

Regulation (EU) 2023/1670 covers smartphones, mobile phones other than smartphones, cordless phones and slate tablets. A slate tablet is defined in Article 2(8) by, among other things, a display of at least 17.78 centimetres and an operating system designed for mobile platforms. Laptops and routers are not covered. See EU Ecodesign Smartphone and Tablet Update Rules Explained for detail.

EU Cyber Resilience Act

The CRA applies to products with digital elements made available on the EU market. Its scope is defined by reference to products with digital elements rather than to a single device family. The full scope and exclusions are in our EU Cyber Resilience Act Guide.

Key obligations

UK PSTI: publish the defined support period

Schedule 1 to the 2023 Regulations sets three security requirements. Paragraph 1 deals with passwords, which must be unique per product or defined by the user. Paragraph 2 requires manufacturers to publish at least one point of contact for reporting security issues, and to say when a reporter will receive acknowledgement and status updates. Paragraph 3 is the support period rule.

Under paragraph 3(2), the defined support period must be published. Paragraph 3(4) and 3(5) set how: the information must be accessible, clear and transparent, provided without prior request, in English, free of charge, and understandable by a reader without prior technical knowledge. Where the manufacturer's own website carries an invitation to purchase the product, the information must be published alongside, or with equal prominence to, the price information. Under paragraph 3(3), if the minimum period is extended, the new period must be published as soon as is practicable. Under paragraph 3(6), the requirement is not met if the defined support period is shortened after publication.

The PSTI text does not set a minimum length. A manufacturer may state a short period, but it must state it, and it cannot later cut it.

EU Ecodesign: five years after end of sale for phones and tablets

Annex II of Regulation (EU) 2023/1670 requires operating system updates to be available at no cost for all units of a product model with the same operating system, from the date of end of placement on the market to at least five years after that date. Security and corrective updates must be available at the latest four months after the public release of the source code of the update, and functionality updates at the latest six months after. If source code is not publicly released, timing runs from the release of an update of the same operating system by its provider.

EU CRA: a support period of at least five years, stated at purchase

Article 13(8) of the CRA sets the minimum support period. The support period shall be at least five years. Where the product is expected to be in use for less than five years, the support period shall correspond to the expected use time.

Article 13(9) requires that each security update made available during the support period remains available after it has been issued for a minimum of ten years, or for the remainder of the support period if that is longer.

Article 13(19) requires the end date of the support period, including at least the month and the year, to be clearly and understandably specified at the time of purchase.

Recital 40 adds context for hardware that cannot run the latest operating system: where a hardware product is not compatible with the latest version of the operating system it was originally delivered with, the manufacturer should continue to provide security updates at least for the latest compatible version for the support period.

How the three regimes fit together

Each instrument answers a different question. PSTI asks a manufacturer to say how long it will support a product and to keep that promise. Ecodesign fixes a minimum for one device family and ties it to the end of sale. The CRA sets a minimum for almost all connected products and requires the end date to be stated at purchase. A phone sold in both markets may therefore carry a published PSTI support statement, an Ecodesign obligation linked to its end of sale, and from December 2027 a CRA support period with a stated month and year. Organisations should record all of these for each model, and use whichever gives the latest firm end date as the planning date only once it has been confirmed by the manufacturer.

Recording support periods in practice

The legal texts describe what manufacturers must do. Buyers still need a consistent way to capture the result. The following fields are an NHI Mgmt Group suggestion for an asset register, not a legal requirement.

FieldWhat to recordTypical source
Product modelExact model and hardware revisionInvoice or device management inventory
Published support periodThe period or end date the manufacturer statesManufacturer's PSTI statement or, from December 2027, its CRA statement at purchase
Date capturedWhen you recorded the statementYour own record
ExtensionsAny later published extensionManufacturer's website
End of sale (phones and tablets)When the model stopped being placed on the EU marketSupplier confirmation
Credentials heldCertificates, keys, service accounts and tokens on or tied to the deviceIdentity and secrets inventories
Planned retirementDate by which the device and its credentials will be withdrawnYour replacement plan

Capturing the date you recorded each statement matters because PSTI allows extensions but not reductions. If a manufacturer later publishes a shorter period, your dated record is evidence of the original commitment. For products that hold non-human identities, link the asset record to the credential inventory so that retirement of one triggers revocation of the other.

Enforcement and penalties

PSTI enforcement and penalties are covered in the UK PSTI Act Guide. They are not restated here.

The Ecodesign text reviewed for this guide does not set fine amounts. Confirm penalties with the relevant national authority.

Under Article 64(2) of the CRA, non-compliance with the essential cybersecurity requirements in Annex I and the obligations in Articles 13 and 14 is subject to administrative fines of up to EUR 15 000 000 or, for an undertaking, up to 2.5% of its total worldwide annual turnover for the preceding financial year, whichever is higher.

What it means for security and identity teams

Support periods matter to identity teams because connected devices carry credentials. A router can store administrator passwords and VPN keys. A phone holds passkeys, authenticator seeds and device certificates. A camera or building sensor authenticates to a cloud service with a device identity that is, in effect, a non-human identity. When support ends, the device keeps working and keeps authenticating, but its vulnerabilities stay open.

  • Asset records: add a support end date field for every connected product and populate it from the manufacturer's published PSTI or CRA statement.
  • Device trust: use support status as an input to conditional access, so that unsupported devices lose access to sensitive systems.
  • Credential lifecycle: plan revocation of device certificates, API keys and service accounts tied to a product before its support ends.
  • Procurement: require suppliers to provide the support end date with the quote, and reject products that cannot state one.

Compliance steps for manufacturers and buyers

  1. Manufacturers selling in Great Britain: confirm the defined support period is published for each product in line with Schedule 1, paragraph 3, and that no period has been shortened.
  2. Manufacturers of phones and tablets selling in the EU: track end of placement on the market per model and plan update delivery to at least five years beyond it, within the four and six month timing limits.
  3. Manufacturers preparing for the CRA: set a support period of at least five years, or the expected use time, and prepare to state the month and year of its end at purchase from 11 December 2027.
  4. Buyers: collect the support statements for every product line and record them in the asset register.
  5. Buyers: align replacement budgets and credential retirement with the recorded end dates.
  6. Both: monitor the legal texts for amendments and delegated acts, including any that set minimum support periods for specific product categories under the CRA.

Common failure patterns

  • Assuming PSTI sets a minimum support period. It requires publication and forbids shortening, but sets no length.
  • Reading the Ecodesign five years from launch rather than from end of placement on the market.
  • Assuming the CRA already applies in full. Its general application date is 11 December 2027.
  • Recording a support end date once and never checking for published extensions.
  • Keeping device credentials valid after the device leaves support.

Practitioner checklist

  • Map each product line to PSTI, Ecodesign and CRA applicability.
  • Store the published support end date for every connected product model.
  • Flag products with no published support period for review or replacement.
  • Feed support status into device trust and conditional access policies.
  • Schedule revocation of device and service credentials before support ends.
  • Add support period disclosure to procurement requirements.
  • Review this page against the legal texts at least every six months.

Standards and references

Related NHI Mgmt Group resources: UK PSTI Act Guide · EU Cyber Resilience Act Guide · EU Ecodesign Smartphone and Tablet Update Rules Explained · Technology End of Life Policy Template

PDF for subscribers

Take this guide with you

Every section, table and checklist in one PDF, with links to the sources and related guides. Subscribe to our weekly NHI & AI Identity Journal and we’ll email you a download link.

Free weekly newsletter

Subscribe to the NHI & AI Identity Journal

The latest on NHI and Agentic AI security – articles, research, breaches, news and events every week.

Bonus 33% off our NHI Course when you subscribe.

PDF Downloads for Newsletter Subscribers

Get the guide

Enter your details and we’ll email you a download link.

The full guide is free to read online. The PDF is a thank you for subscribing.

Fill in all fields marked * and tick both boxes to continue.