NERC CIP-002 is the entry point to the NERC Critical Infrastructure Protection standards: it requires each Responsible Entity to identify and categorise its BES Cyber Systems as high, medium or low impact, and that categorisation decides which CIP requirements apply to every system, account and credential that follows. This guide walks through the requirements of CIP-002-5.1a, the Attachment 1 impact rating criteria, the 15 calendar month review cycle and what the categorisation means for security and identity teams.

The page is based on the text of NERC Reliability Standard CIP-002-5.1a, Cyber Security: BES Cyber System Categorization, as published by NERC. It is not legal advice. Confirm the version that is subject to enforcement in your jurisdiction on NERC's reliability standards pages, and take advice from your compliance team and Regional Entity.

Status as of 19 Nov 2026: this guide summarises CIP-002-5.1a. Its implementation text states an effective date of the later of 1 July 2015 or the first calendar day of the ninth calendar quarter after the applicable regulatory approval. We did not confirm from NERC's site whether a later CIP-002 version has been approved or scheduled, so check the current United States standards list before relying on clause numbers.

Key takeaways

  • CIP-002 does not set security controls itself. It decides which BES Cyber Systems are high, medium or low impact, and the other CIP standards then apply by impact level.
  • Requirement R1 asks for a process that considers listed asset types, such as Control Centres, transmission stations and substations, generation resources and restoration assets, and identifies high impact systems under Attachment 1 Section 1, medium impact systems under Section 2 and each asset containing a low impact system under Section 3.
  • High impact covers BES Cyber Systems used by and located at Reliability Coordinator Control Centres and certain Balancing Authority, Transmission Operator and Generator Operator Control Centres.
  • Medium impact criteria use thresholds such as generation of 1,500 MW or more at a single plant location, Transmission Facilities at 500 kV or higher, and weighted value tests for 200 to 499 kV facilities.
  • Low impact is the remainder: BES Cyber Systems at listed asset types that do not meet Section 1 or Section 2.
  • Requirement R2 asks for a review of the identifications, and approval by the CIP Senior Manager or delegate, at least once every 15 calendar months.
  • Getting categorisation wrong cascades into every later standard, including the access management, authentication and credential controls that govern human and non-human accounts.

CIP-002 at a glance

ItemDetail
StandardCIP-002-5.1a, Cyber Security: BES Cyber System Categorization
PurposeIdentify and categorise BES Cyber Systems and their associated BES Cyber Assets
RequirementsR1 identification by impact rating; R2 review and approval
Review cycleAt least once every 15 calendar months
ApprovalCIP Senior Manager or delegate
Impact levelsHigh (Attachment 1 Section 1), Medium (Section 2), Low (Section 3)
Evidence retentionThree calendar years, according to the standard's compliance section
Effective date (5.1a)Later of 1 July 2015 or the first day of the ninth calendar quarter after regulatory approval

Scope

CIP-002 applies to Responsible Entities registered with NERC in functions that affect the reliability of the Bulk Electric System, as set out in the standard's applicability section. Check the applicability section of the standard for the functional entities it lists. Distribution Providers are brought in only for specific Protection Systems, which is why Attachment 1 criterion 3.6 refers to applicability section 4.2.1.

The unit of categorisation is the BES Cyber System: a grouping of BES Cyber Assets that perform reliability tasks. Entities choose how to group assets into systems. A grouping that is too broad can drag low risk assets into high impact obligations; a grouping that is too narrow can leave dependencies unidentified. Either way, the choice should be documented and defensible at audit.

Key obligations

Requirement R1: identify and categorise

R1 requires each Responsible Entity to implement a process that considers each of a list of asset types for the purposes of parts 1.1 to 1.3. The assets listed include Control Centres and backup Control Centres, transmission stations and substations, generation resources, systems and facilities critical to system restoration including Blackstart Resources and Cranking Paths, Special Protection Systems that support the reliable operation of the Bulk Electric System, and, for Distribution Providers, the Protection Systems named in the applicability section.

  • Part 1.1: identify each high impact BES Cyber System according to Attachment 1, Section 1, if any, at each asset.
  • Part 1.2: identify each medium impact BES Cyber System according to Attachment 1, Section 2, if any, at each asset.
  • Part 1.3: identify each asset that contains a low impact BES Cyber System according to Attachment 1, Section 3, if any.

Requirement R2: review and approve

  • Part 2.1: review the identifications in R1 and update them where needed, at least once every 15 calendar months, even if there are no identified items.
  • Part 2.2: have the CIP Senior Manager or delegate approve the R1 identifications at least once every 15 calendar months, even if there are no identified items.

Attachment 1, Section 1: high impact

High impact BES Cyber Systems are those used by and located at:

  • 1.1: Reliability Coordinator Control Centres or backup Control Centres.
  • 1.2: Balancing Authority Control Centres or backup Control Centres that control 3,000 MW or more of generation in a single Interconnection, or that control generation meeting criteria 2.3, 2.6 or 2.9.
  • 1.3: Transmission Operator Control Centres or backup Control Centres that perform the functional obligations of the Transmission Operator for assets meeting criteria 2.2, 2.4, 2.5, 2.7, 2.8, 2.9 or 2.10.
  • 1.4: Generator Operator Control Centres or backup Control Centres that control generation meeting criteria 2.1, 2.3, 2.6 or 2.9.

Attachment 1, Section 2: medium impact

Medium impact covers BES Cyber Systems not already high impact that are associated with any of the following, summarised from the standard:

CriterionSummary
2.1Generation with an aggregate rating of 1,500 MW or more at a single plant location, in a single Interconnection
2.2Reactive resources of 1,000 MVAR or more at a single location, excluding generation Facilities
2.3Generation designated by the Planning Coordinator or Transmission Planner as needed to avoid an Adverse Reliability Impact in the planning horizon of more than one year
2.4Transmission Facilities operated at 500 kV or higher
2.5Transmission Facilities operated between 200 kV and 499 kV at a single station or substation that meet connection and aggregate weighted value thresholds (aggregate weighted value exceeding 3,000)
2.6Generation or Transmission Facilities identified as critical to the derivation of Interconnection Reliability Operating Limits
2.7Transmission Facilities identified as essential to meeting Nuclear Plant Interface Requirements
2.8Transmission Facilities, including generation interconnection Facilities, whose loss would result in the loss of generation meeting criterion 2.1 or 2.3
2.9Special Protection Systems or Remedial Action Schemes whose failure would cause a violation of an Interconnection Reliability Operating Limit
2.10Systems performing automatic underfrequency or undervoltage load shedding of 300 MW or more under a common regional load shedding programme
2.11Generator Operator Control Centres, not already high impact, that control 1,500 MW or more of generation in a single Interconnection
2.12Transmission Operator Control Centres not already high impact
2.13Balancing Authority Control Centres, not already high impact, that control 1,500 MW or more of generation in a single Interconnection

The thresholds above are a summary. Each criterion has qualifying words in the standard, such as how aggregate ratings are calculated and which designations count, so work from the full text when you categorise.

Attachment 1, Section 3: low impact

Low impact covers BES Cyber Systems not in Sections 1 or 2 that are associated with any of the following assets that meet the applicability qualifications: Control Centres and backup Control Centres (3.1), transmission stations and substations (3.2), generation resources (3.3), systems and facilities critical to system restoration including Blackstart Resources and Cranking Paths (3.4), Special Protection Systems that support the reliable operation of the Bulk Electric System (3.5), and, for Distribution Providers, the Protection Systems specified in applicability section 4.2.1 (3.6). Low impact obligations are covered in our separate guide to CIP-003.

Enforcement and penalties

NERC Reliability Standards are mandatory and enforceable for registered entities in the United States under the oversight of the Federal Energy Regulatory Commission, and compliance is monitored by NERC and the Regional Entities through audits, self certifications, spot checks and self reports. CIP-002-5.1a contains a compliance section with violation severity levels and an evidence retention period of three calendar years. This page does not set out penalty amounts, which depend on the enforcement process and the facts of each case; take advice from your compliance function.

Categorisation errors tend to be high consequence findings because they cascade. An unidentified medium impact system means every medium impact requirement in the other CIP standards was never applied to it, including access management, authentication and logging.

What it means for security and identity teams

Categorisation decides identity controls

The impact rating attached under CIP-002 decides which requirements in standards such as CIP-004 (personnel and training, including access management) and CIP-007 (systems security management) apply. For identity teams this means the first question for any account, human or machine, on an operational system is: what is the impact rating of the BES Cyber System it can reach? The answer sets the expected authorisation, review, revocation and authentication controls.

Non-human identities across impact boundaries

Operational environments depend on non-human identities: historian replication accounts, SCADA and energy management system service accounts, vendor remote support accounts, monitoring agents, backup agents and data diode or data broker integrations. These accounts frequently cross from a corporate network into an Electronic Security Perimeter, or from a medium impact Control Centre to low impact substations. The NHI Mgmt Group recommendation is to tag every service account and credential with the highest impact rating it can reach, so that its controls follow the most demanding system, and to record the owner and purpose alongside the CIP-002 categorisation records.

Shared and default accounts

Field devices and older control systems often ship with shared or default accounts. Once a system is categorised as medium or high impact, those accounts fall under stricter account management expectations in the downstream standards. Build the account inventory at the same time as the asset categorisation so that the identity work starts with accurate scope.

The 15 month cycle as an identity checkpoint

Each R2 review is an opportunity to reconcile the categorisation with reality: new generation, new substations, reconfigured Control Centres and new vendor connections. Attach an identity reconciliation to the same cycle: confirm which accounts and credentials can reach each newly categorised or recategorised system, and remove access where a system has moved out of scope or been decommissioned.

Change is the risk

A capacity upgrade that crosses the 1,500 MW threshold, a new 500 kV line or a Planning Coordinator designation under criterion 2.3 can move a system from low to medium impact. Make sure engineering change management notifies the CIP compliance and security teams so that the categorisation, and the controls on every account that touches the system, are updated before the change goes live where possible.

Compliance steps

  1. Confirm the applicable version. Check NERC's United States standards list for the CIP-002 version subject to enforcement and any pending version.
  2. Document the process. Write the R1 process, covering every listed asset type, the Attachment 1 criteria and how BES Cyber Systems are grouped.
  3. Gather engineering inputs. Collect generation ratings, MVAR ratings, voltage levels, weighted value calculations and Planning Coordinator or Transmission Planner designations.
  4. Categorise and record. Produce lists of high and medium impact BES Cyber Systems and of assets containing low impact systems, with the criterion that applied.
  5. Approve. Obtain CIP Senior Manager or delegate approval and keep dated evidence.
  6. Link identity inventories. For each categorised system, record the human accounts, service accounts, vendor accounts and credentials that can reach it, with an owner.
  7. Set triggers. Tie engineering change, new interconnections and new vendor access to a categorisation check.
  8. Repeat within 15 calendar months. Schedule the review well ahead of the deadline and keep evidence for three calendar years.

Common failure patterns

  • Missed assets. Backup Control Centres, Cranking Path assets or Special Protection Systems left out of the R1 process.
  • Stale thresholds. Generation or transmission changes that cross a medium impact threshold without a new categorisation.
  • Late reviews. The 15 calendar month review slips because it is planned as an annual task without a buffer.
  • Undocumented groupings. BES Cyber System groupings that nobody can explain at audit.
  • Accounts outside the picture. Vendor and service accounts that reach a categorised system but are not listed against it.
  • Approval gaps. Categorisation updated but not re-approved by the CIP Senior Manager or delegate.

Practitioner checklist

  • Applicable CIP-002 version confirmed and recorded.
  • R1 process covers every listed asset type, including backup Control Centres and restoration assets.
  • Each high and medium impact BES Cyber System listed with the Attachment 1 criterion applied.
  • Each asset containing a low impact BES Cyber System identified.
  • CIP Senior Manager or delegate approval dated within the last 15 calendar months.
  • Engineering change process triggers a categorisation check.
  • Every human, service and vendor account mapped to the highest impact system it can reach.
  • Evidence retained for three calendar years.

Standards and references

Related NHI Mgmt Group resources: NERC CIP Guide · NERC CIP-003-9 Low Impact BES Cyber Systems Guide · NERC CIP-013 · ICS Advisory Triage and OT Vulnerability Management Guide

PDF for subscribers

Take this guide with you

Every section, table and checklist in one PDF, with links to the sources and related guides. Subscribe to our weekly NHI & AI Identity Journal and we’ll email you a download link.

Free weekly newsletter

Subscribe to the NHI & AI Identity Journal

The latest on NHI and Agentic AI security – articles, research, breaches, news and events every week.

Bonus 33% off our NHI Course when you subscribe.

PDF Downloads for Newsletter Subscribers

Get the guide

Enter your details and we’ll email you a download link.

The full guide is free to read online. The PDF is a thank you for subscribing.

Fill in all fields marked * and tick both boxes to continue.