Join our Newsletter — 33% off our NHI Course
Home› Guides› NIS2 Article 21(2)(e) Secure Development and Vulnerability Handling:…
Guide Regulations & Frameworks

NIS2 Article 21(2)(e) Secure Development and Vulnerability Handling: Requirements and Evidence

PDF for newsletter subscribers · free to read online

← All guides
By NHI Mgmt Group, under the editorial direction of Lalit Choda Updated 27 November 2026 13 min read
On this page

NIS2 makes the security of how you buy, build and maintain systems a legal duty, including how you find, fix and disclose vulnerabilities, yet many entities can show a patching tool but not the rules, test records and decisions an auditor will ask for. This guide explains the measure in Article 21(2)(e) of Directive (EU) 2022/2555 and the detail that Commission Implementing Regulation (EU) 2024/2690 adds in its Annex section 6, then turns each requirement into the evidence you should be able to produce. It is written for compliance, application security and procurement leads in essential and important entities. It does not repeat the overall NIS2 regime (see the NIS2 Directive Guide) or supplier contracts under Article 21(2)(d) (see the NIS2 Supply Chain Security Guide). Status checked on 26 November 2026; national transposition laws differ, so confirm the wording in the law that applies to you.

Key takeaways

  • One measure, three activities: Article 21(2)(e) covers security in network and information systems acquisition, development and maintenance, including vulnerability handling and disclosure.
  • The Annex is the checklist: Implementing Regulation 2024/2690 Annex section 6 breaks the measure into ten points, from secure acquisition (6.1) to vulnerability handling and disclosure (6.10).
  • Binding for some, a benchmark for all: the Implementing Regulation binds the digital infrastructure and digital provider entity types it lists; for other sectors it is the most detailed EU statement of what "appropriate" looks like, and many national authorities point to it.
  • Evidence beats policy: nearly every Annex point ends with "review at planned intervals" and asks you to document results, exceptions and reasons, so records matter as much as rules.
  • Disclosure links to national CVD: your disclosure procedure must fit the national coordinated vulnerability disclosure policy, and product makers also face the Cyber Resilience Act.

What Article 21(2)(e) requires

Article 21(1) requires Member States to ensure that essential and important entities take appropriate and proportionate technical, operational and organisational measures to manage the risks to their network and information systems. Article 21(2) lists the minimum measures; point (e) is "security in network and information systems acquisition, development and maintenance, including vulnerability handling and disclosure". The measures must take an all-hazards approach and be proportionate to the entity's exposure, size and the likely impact of incidents.

Three neighbouring provisions shape how point (e) is read:

  • Article 21(2)(d) and 21(3): supply chain security, and the duty to consider the vulnerabilities specific to each direct supplier. Acquisition under (e) is about the security of what you buy; (d) is about the supplier relationship. Keep them in one programme but evidence them separately.
  • Article 12: each Member State designates a CSIRT as coordinator for coordinated vulnerability disclosure, acting as a trusted intermediary between reporters and vendors, and ENISA maintains a European vulnerability database. See the EU Vulnerability Database (EUVD).
  • Article 20: management bodies approve the measures, oversee their implementation and can be held liable, so the secure development and vulnerability rules need board-level approval, not only an engineering wiki page.

Implementing Regulation 2024/2690 detail

Article 21(5) required the Commission to adopt implementing acts setting technical and methodological requirements for specific entity types. Implementing Regulation (EU) 2024/2690 applies to DNS service providers, TLD name registries, cloud computing service providers, data centre service providers, content delivery network providers, managed service providers, managed security service providers, online marketplaces, online search engines, social networking services platforms and trust service providers. Its Annex section 6 is titled "Security in network and information systems acquisition, development and maintenance". For an overview of the whole Annex, see the NIS2 Implementing Regulation 2024/2690 Guide.

Annex pointSubjectWhat it asks for (paraphrased)
6.1Security in acquisition of ICT services or productsRisk-based processes for buying security-critical components across their life cycle: security requirements, updates for the product lifetime or replacement, component information, secure configuration descriptions, assurance of compliance and validation of delivered products
6.2Secure development life cycleSecure development rules for all phases, in-house or outsourced; security requirements at design; secure engineering principles such as security by design and zero trust; secure development environments; security testing; protected and sanitised test data
6.3Configuration managementDocumented, enforced and monitored secure configurations for hardware, software, services and networks
6.4Change management, repairs and maintenanceChange control covering releases, modifications and emergency changes; impact testing before implementation; documented reasons for emergency bypasses
6.5Security testingA testing policy; risk-based scope, frequency and type; documented methodology and results including criticality; mitigation of critical findings
6.6Security patch managementPatches applied within a reasonable time, tested, from trusted sources and integrity checked; compensating measures and a documented justification when a patch is not applied
6.7Network securityNetwork architecture, remote access control including service providers, separation of security administration systems
6.8Network segmentationRisk-based zones, a demilitarised zone, separation of production from development and test environments
6.9Protection against malicious and unauthorised softwareMeasures to detect or prevent malicious and unauthorised software
6.10Vulnerability handling and disclosureMonitoring vulnerability information from CSIRTs, authorities and suppliers; planned scans with retained evidence; fixing critical vulnerabilities without undue delay; a disclosure procedure consistent with the national CVD policy; documented decisions where remediation is not required

Points 6.7 to 6.9 sit in section 6 but are usually run by network and endpoint teams; this guide concentrates on acquisition, development, change, testing, patching and vulnerability handling. ENISA's NIS2 Technical Implementation Guidance (June 2025) gives examples of evidence and a mapping table to standards for each Annex requirement and is the best companion when you build your own evidence list.

Secure acquisition

Point 6.1 is where procurement, architecture and security meet. The NIS2 Supply Chain Security Guide covers contract terms in depth; the practical acquisition controls are:

  1. Classify the purchase: decide early whether the product or service is a component critical to the security of your systems, using the risk assessment from Annex point 2.1. Only critical components need the full 6.1 treatment, but record the decision either way.
  2. Set security requirements before selection: authentication options, logging, encryption, secure defaults and administrative access belong in the requirement set, not in a post-contract review.
  3. Ask for life cycle commitments: security updates throughout the expected lifetime, or a replacement path after end of support, and information on hardware and software components (an SBOM where the supplier offers one).
  4. Validate on delivery: check that what arrived matches what was promised, using your own tests or the supplier's assurance, and keep the result.
  5. Review: revisit the process at planned intervals and after significant incidents.

Products that will fall under the Cyber Resilience Act help here: from 11 December 2027 manufacturers must meet its essential requirements, which include vulnerability handling duties, and its reporting obligations under Article 14 apply from 11 September 2026. See the EU Cyber Resilience Act Guide and the EU CRA SBOM and Vulnerability Handling Requirements Guide.

Secure development

Point 6.2 applies to anything you develop, whether your own teams write it or a contractor does. Outsourced development must also meet the supply chain requirements in Annex point 5 and the acquisition requirements in 6.1. A secure development life cycle that already follows NIST SP 800-218 (the Secure Software Development Framework, with its practice groups Prepare the Organisation, Protect the Software, Produce Well-Secured Software and Respond to Vulnerabilities) or ISO/IEC 27001:2022 Annex A controls 8.25 to 8.33 will cover most of 6.2. The Secure Software Development Lifecycle (SSDLC) Guide explains how to build one; here is what NIS2 adds.

  • Rules before code: the rules must exist before development starts and cover every phase. A Secure SDLC Policy Template approved by management is the simplest evidence.
  • Requirements at design: record security requirements and threat modelling outcomes for each significant system or change.
  • Secure engineering principles: the Annex names security by design and zero trust architectures as examples. State which principles you apply and how design reviews check them.
  • Development environment security: source control, build pipelines and developer access are in scope. Pipeline credentials, signing keys and deployment tokens are non-human identities that need owners, scoped permissions and rotation.
  • Security testing in the life cycle: static and dynamic analysis, dependency scanning and peer review, with results recorded.
  • Test data: select, protect and manage test data, and sanitise or anonymise it where the risk assessment says so. Production personal data copied into test environments is a common finding.

Points 6.3 to 6.5 then carry the work into operation: secure baselines enforced by tooling, change control that records emergency changes and their reasons, and a security testing policy with a documented methodology and mitigation of critical findings.

Vulnerability handling and disclosure

Points 6.6 and 6.10 together form the vulnerability management obligation. Five elements need to be visible:

ElementAnnex basisPractical implementation
Intake of vulnerability information6.10: CSIRT announcements, authorities, suppliersSubscriptions to national CSIRT and supplier advisories, the EUVD and the CISA Known Exploited Vulnerabilities catalogue, mapped to your asset inventory
Scanning6.10: planned intervals, evidence keptAuthenticated scanning schedule by asset class, with retained reports
Prioritisation and remediation6.10: critical vulnerabilities without undue delay; 6.6: reasonable timeWritten remediation targets by severity and exposure, with exploitation status as a priority factor
Patching discipline6.6: tested, trusted sources, integrity checkedPatch testing in pre-production, signature or hash verification, links to change records
Exceptions6.6 and 6.10: compensating measures and documented justificationRisk acceptance register with owner, compensating controls and expiry date

Disclosure: point 6.10 asks for a disclosure procedure consistent with the applicable national coordinated vulnerability disclosure policy. In practice that means:

  • A public way for researchers to report vulnerabilities in your services, such as a security.txt file (RFC 9116) pointing to a reporting page.
  • A published policy stating scope, how reports are acknowledged, expected timelines and safe harbour wording reviewed by legal counsel.
  • An internal handling process (ISO/IEC 30111 describes one) that triages reports, tracks fixes and decides what to tell affected parties.
  • A route to the national CSIRT coordinator when a vulnerability affects other vendors or a reporter asks for coordination under Article 12.

See the Bug Bounty and Vulnerability Disclosure Guide for programme design. A vulnerability that has been exploited may also trigger incident reporting under Article 23; keep the vulnerability and incident processes connected so that the 24-hour early warning clock is not missed.

Evidence to keep

The table below is a requirement-to-evidence map. Auditors and national authorities typically sample records, so keep them dated and attributable.

RequirementEvidenceOwnerReview
6.1 AcquisitionProcurement procedure with security gate; criticality decisions; security requirement sets; supplier update commitments; delivery validation recordsProcurement with security architecturePlanned interval and after significant incidents
6.2 Secure developmentApproved secure development rules; design security requirements and threat models; pipeline access reviews; test data handling records; outsourced development clausesHead of engineering, AppSec leadPlanned interval
6.3 ConfigurationSecure baselines; configuration compliance reports; deviations with reasonsPlatform and infrastructurePlanned interval and after changes
6.4 ChangeChange records with impact assessment and tests; emergency change log with reasonsChange managerPlanned interval and after incidents
6.5 Security testingTesting policy; methodology; reports with criticality; mitigation tracking for critical findingsAppSec or offensive security leadPlanned interval
6.6 PatchingPatch procedure; deployment records against targets; integrity verification; exceptions with justificationIT operationsContinuous, reported monthly
6.10 VulnerabilitiesIntake sources list; scan schedule and reports; remediation metrics; mitigation plans; disclosure policy and report logVulnerability management leadMonitoring channels reviewed at planned intervals
Article 20 governanceManagement body approval of the above rules and periodic reportingCISOAt least annually

Metrics that show it is working:

  • Median days from disclosure to remediation for critical vulnerabilities, against your written target.
  • Percentage of security-critical purchases with a completed security gate and delivery validation.
  • Percentage of releases that passed the defined security tests, and open critical findings older than target.
  • Number of open patch exceptions past their expiry date.
  • Time to acknowledge external vulnerability reports.

Framework mapping:

AreaNIST SP 800-53 Rev 5NIST CSF 2.0ISO/IEC 27001:2022 Annex A
AcquisitionSA-4 Acquisition Process; SR-3 Supply Chain Controls and ProcessesGV.SC-055.19 to 5.23
Secure developmentSA-8 Security and Privacy Engineering Principles; SA-15 Development Process, Standards, and Tools; SA-11 Developer Testing and EvaluationPR.PS-018.25 to 8.31, 8.33
Change and configurationCM-8 System Component InventoryPR.PS-018.9, 8.32
Vulnerabilities and patchingRA-5 Vulnerability Monitoring and Scanning; SI-2 Flaw RemediationID.RA-088.8

Common failure patterns:

  • Policy without records: a secure development standard exists but no design reviews, test results or approvals can be produced for a sample of releases.
  • Undocumented exceptions: systems that cannot be patched are known informally, with no compensating measures or justification on file.
  • Disclosure in name only: a policy page exists but reports go to an unmonitored mailbox and nobody owns acknowledgement.
  • Outsourced code outside the rules: contractors deliver software without the secure development requirements in their contracts.
  • Pipeline identities ignored: build and deployment credentials with broad, long-lived access are not inventoried or rotated, although the development environment is in scope.

Practitioner checklist

  • Confirm whether Implementing Regulation 2024/2690 binds your entity type, and which national law transposes Article 21.
  • Map your existing secure SDLC, patching and vulnerability procedures to Annex points 6.1 to 6.6 and 6.10.
  • Add a security gate and criticality decision to procurement for ICT products and services.
  • Have the management body approve the secure development rules and vulnerability handling procedure.
  • Write remediation targets by severity and exposure, and track exceptions with owners and expiry dates.
  • Publish a vulnerability disclosure policy and security.txt aligned with your national CVD policy.
  • Bring pipeline credentials, signing keys and deployment tokens into identity governance.
  • Build the requirement-to-evidence register and sample it before the authority does.
  • Connect vulnerability handling to Article 23 incident reporting.

Standards and references

Related NHI Mgmt Group resources: NIS2 Directive Guide · NIS2 Implementing Regulation 2024/2690 Guide · Secure Software Development Lifecycle (SSDLC) Guide · EU Cyber Resilience Act Guide. This guide summarises NIS2 Article 21(2)(e) and Implementing Regulation (EU) 2024/2690 Annex section 6 and is not legal advice.

PDF for subscribers

Take this guide with you

Every section, table and checklist in one PDF, with links to the sources and related guides. Subscribe to our weekly NHI & AI Identity Journal and we’ll email you a download link.

Free weekly newsletter

Subscribe to the NHI & AI Identity Journal

The latest on NHI and Agentic AI security – articles, research, breaches, news and events every week.

Bonus 33% off our NHI Course when you subscribe.

PDF Downloads for Newsletter Subscribers

Get the guide

Enter your details and we’ll email you a download link.

The full guide is free to read online. The PDF is a thank you for subscribing.

Fill in all fields marked * and tick both boxes to continue.