On this page

Many ISMS teams log audit findings but cannot show an auditor that the cause was found, the fix was checked and the same problem has not come back, which is exactly what ISO/IEC 27001 clause 10 asks for. This template gives you a nonconformity and corrective action procedure with numbered sections you can adopt, a corrective action record with the fields auditors look for, short guidance on root cause methods, and a way to run continual improvement as a managed backlog rather than a slogan. It is written for ISMS managers, internal auditors and control owners preparing for certification or surveillance audits. Status as checked in November 2026: ISO/IEC 27001:2022 (third edition, published October 2022) is the current edition, and in it clause 10.1 is continual improvement and 10.2 is nonconformity and corrective action, the reverse of the 2013 order, with no change to the requirements themselves. The clause text is ISO copyright, so this page paraphrases it; buy the standard for the authoritative wording.

How to use this template

  • Replace text in square brackets, such as [Organisation], [ISMS Manager] and [X working days], with your own names and values. Values in brackets are illustrative starting points, not requirements of the standard.
  • "Must" marks a requirement of this procedure; "should" marks recommended practice where a justified exception may apply.
  • Sections 4 to 6 implement clause 10.2; section 7 implements clause 10.1. The corrective action record in section 6 is the documented information auditors will sample.
  • Use one register for every source of nonconformity: internal audit, external audit, incidents, monitoring results, complaints and missed objectives. Separate lists hide trends.
  • This procedure feeds and is fed by internal audit (9.2) and management review (9.3). See ISMS Internal Audit and Management Review for those clauses.
Clause (2022 numbering)SubjectWhat it expects, paraphrasedTemplate section
10.1Continual improvementKeep improving how suitable, adequate and effective the ISMS is7
10.2Nonconformity and corrective action: reactAct to control and correct the nonconformity and deal with its consequences4, 5
10.2Evaluate the need to remove causesReview it, find its causes, and check whether similar nonconformities exist or could occur5
10.2Implement and reviewCarry out the actions needed, then review whether they were effective5
10.2Change the ISMS if neededCorrective actions are proportionate to the effects, and may change processes or controls5, 7
10.2Documented informationKeep evidence of the nature of each nonconformity, the actions taken and their results6

1. Purpose

1.1 This procedure sets out how [Organisation] identifies, records, corrects and learns from nonconformities in its information security management system (ISMS), and how it continually improves the ISMS, to meet clause 10 of ISO/IEC 27001:2022.

1.2 It aims to make sure that every nonconformity is contained, its root cause is understood, corrective action removes that cause, and the effectiveness of the action is verified with evidence.

2. Scope

2.1 This procedure applies to all processes, controls, locations, people and suppliers within the ISMS scope defined in [ISMS scope statement reference].

2.2 It covers nonconformities raised from: internal audits; certification and surveillance audits; customer or regulator audits; information security incidents and near misses; monitoring and measurement results under clause 9.1; failed control tests; missed information security objectives under clause 6.2; and complaints or reports from staff, customers and suppliers.

2.3 Improvement opportunities (observations and suggestions that are not nonconformities) are handled under section 7.

3. Roles and responsibilities

RoleResponsibilities
[ISMS Manager]Owns this procedure and the corrective action register; assigns owners; tracks due dates; reports trends to management review
Finding owner (process or control owner)Contains the issue, leads root cause analysis, proposes and delivers corrective action, provides evidence
[Internal Audit Lead]Raises audit nonconformities, agrees grading, verifies effectiveness independently of the owner
[Information Security Steering Group]Approves extended due dates and risk acceptance, resources major corrective actions, reviews the improvement backlog
[Top Management]Reviews nonconformity and corrective action status at management review (clause 9.3) and decides on improvements
All staffReport suspected nonconformities and security weaknesses through [reporting channel]

4. Identifying nonconformities

4.1 A nonconformity is the non-fulfilment of a requirement. Requirements include ISO/IEC 27001 clauses, controls in the Statement of Applicability, [Organisation]'s own policies and procedures, and legal, regulatory and contractual obligations.

4.2 Anyone who identifies a suspected nonconformity must record it in the corrective action register within [2 working days].

4.3 The [ISMS Manager] must grade each nonconformity:

  • Major: a requirement is not addressed at all, or a failure seriously threatens the ISMS meeting its intended outcomes (for example, no internal audit performed in the period, or a mandatory control absent across the scope).
  • Minor: a single or isolated lapse where the requirement is generally met (for example, one leaver whose access was removed late).
  • Observation or opportunity for improvement: not a nonconformity; handled under section 7.

4.4 Grading aligns with the practice of [certification body]. External auditors' grades are recorded as issued.

4.5 Information security incidents are reviewed under [incident management procedure]. Where an incident shows that a control or process did not meet its requirement, a nonconformity must also be raised here.

5. Corrective action and root cause

5.1 Correction (react): the finding owner must take immediate action to control and correct the nonconformity and deal with its consequences within [5 working days for major, 10 for minor], for example removing access that should not exist or restoring a missed backup.

5.2 Root cause analysis: the finding owner must determine the cause using a method proportionate to the grade:

  • 5 whys: ask "why did this happen?" repeatedly until the answer is a process, design or resourcing cause that can be changed, not an individual's mistake. Suited to minor and single-cause findings.
  • Fishbone (Ishikawa) diagram: group possible causes under headings such as people, process, technology, suppliers, environment and measurement, then test each. Suited to major or recurring findings with several contributing causes.
  • Timeline review: for incident-driven findings, reconstruct the sequence of events to see where a control should have acted. See the Post-Incident Review and Root Cause Analysis Template.

5.3 "Human error" or "staff not aware" must not be accepted as a root cause on its own. The analysis must say why the process allowed the error or why awareness did not work.

5.4 Extent check: the owner must check whether similar nonconformities exist elsewhere, or could occur, in other teams, systems, locations or suppliers, and record the result.

5.5 Corrective action plan: the owner must propose actions that remove the cause, proportionate to the effects of the nonconformity. Due dates are [30 days for major, 90 days for minor] unless the [Information Security Steering Group] approves an extension.

5.6 Risk and ISMS update: where the nonconformity reveals a new or changed risk, the risk assessment and risk treatment plan must be updated under clause 6.1. Where it requires a change to policies, processes or the Statement of Applicability, the change must follow [change procedure].

5.7 Effectiveness review: after the planned close date plus [60 days], someone other than the finding owner (normally the [Internal Audit Lead]) must verify that the action was implemented and that the nonconformity has not recurred, using evidence such as a resample of records, a control test or monitoring data. If the action was not effective, the finding is reopened with a new root cause analysis.

5.8 A nonconformity is closed only when effectiveness has been verified, not when the action is complete.

6. Recording and evidence

6.1 Each nonconformity must be recorded in the corrective action register with at least the fields below. The register is documented information retained for [3 years or the certification cycle, whichever is longer].

FieldContentWhy auditors look at it
ReferenceUnique ID, e.g. NC-[YYYY]-[nnn]Traceability from audit report to closure
Source and date raisedInternal audit, external audit, incident, monitoring, complaint; dateShows all sources feed one process
RequirementClause, Annex A control, policy or obligation not metConfirms it is a genuine nonconformity
Description and evidenceWhat was found, where, with objective evidenceNature of the nonconformity
GradeMajor, minorDrives timelines and escalation
OwnerNamed person and roleAccountability
Correction takenImmediate containment and dateReaction to the nonconformity
Root causeMethod used and conclusionEvaluation of causes
Extent checkWhere else it could exist and what was foundSimilar nonconformities considered
Corrective action and due dateActions to remove the causeActions taken
ISMS changesRisk register, SoA, policy or process updates madeChanges to the ISMS where needed
Effectiveness reviewDate, reviewer, evidence, resultResults of corrective action
Status and closure dateOpen, action complete, verified, closed, reopenedProgress and age

6.2 Supporting evidence (screenshots, exports, tickets, meeting minutes) must be linked from the register entry, not held only in email.

6.3 The [ISMS Manager] must report the register to each management review: open items by grade and age, overdue items, reopened items, repeat findings and themes. For the full list of documented information the standard expects, see the ISO 27001 Mandatory Documents and Records Guide.

7. Continual improvement

7.1 [Organisation] must continually improve the suitability, adequacy and effectiveness of the ISMS. Improvement is managed as a backlog, not left to corrective action alone.

7.2 Inputs to the improvement backlog include: audit observations; trends in the corrective action register; incident and near-miss lessons; metrics from clause 9.1 that are off target; results of management review; changes in threats, technology, business or legal requirements; and suggestions from staff and suppliers.

7.3 Each backlog item must have an owner, an expected benefit, a priority and a target date, and is reviewed by the [Information Security Steering Group] at least [quarterly].

7.4 Management review outputs that relate to improvement opportunities and changes to the ISMS must be added to the backlog with a reference to the review minutes.

7.5 Improvements that change risk must go through the risk assessment process under clause 6.1. See ISO 27001 Clause 6.

7.6 This procedure is reviewed at least annually and after any major nonconformity by the [ISMS Manager], and approved by [approver].

Implementation guidance

Rollout in five steps:

  1. Consolidate: move every open finding from audit reports, incident tickets and spreadsheets into one register with the section 6 fields. Close duplicates and record the source of each.
  2. Agree grading and timelines: confirm major and minor definitions and due dates with top management and, if certified, check them against your certification body's own grading rules.
  3. Train owners on root cause: a one-hour session using two of your own past findings, one with 5 whys and one with a fishbone, does more than a generic course.
  4. Pilot on one audit cycle: run the procedure on the findings from the next internal audit, including the effectiveness review, before applying it to every source.
  5. Wire it into management review: add the register summary and improvement backlog as standing agenda items so clause 9.3 inputs and outputs connect to clause 10.

Choosing a tool: a small organisation with fewer than about 30 findings a year can run the register in a controlled spreadsheet with version history. Larger or multi-site organisations should use a GRC platform or ticketing system that enforces required fields, separates owner and verifier, and reports age and recurrence automatically. Either way, the auditor needs to see the same fields and the evidence trail.

Metrics that show the process works:

  • Percentage of corrective actions closed by the due date, by grade.
  • Average age of open major and minor nonconformities.
  • Recurrence rate: findings reopened or repeated within 12 months (the clearest signal that root causes were wrong).
  • Percentage of closed findings with a documented, independent effectiveness review.
  • Number of improvement backlog items delivered per quarter.

Common failure patterns:

  • Correction mistaken for corrective action: fixing the one late leaver but not the joiner-mover-leaver feed that caused it. Auditors often raise a repeat finding at the next surveillance audit.
  • "Retrain the user" as the only action: treats a symptom and fails the root cause test in 5.3.
  • Closing on completion: marking items closed when the action is done, with no effectiveness check, so there is no evidence of results.
  • No extent check: fixing one system when the same misconfiguration exists across the estate, including service accounts and API keys owned by the same team.
  • Separate registers: incidents in one tool and audit findings in another, so trends are never seen at management review.
  • Improvement only from findings: clause 10.1 left with nothing behind it except closed nonconformities.

Framework links: the same loop appears in NIST CSF 2.0 under the Improvement category of Identify (ID.IM), and NIST SP 800-53 Rev 5 control CA-5 (Plan of Action and Milestones) asks for a plan to correct weaknesses found in assessments, which a corrective action register satisfies in practice.

Standards and references:

Related NHI Mgmt Group resources: ISMS Internal Audit and Management Review · ISO 27001 Surveillance Audit Checklist · ISO 27001 Mandatory Documents and Records Guide · ISO 27001 Certification Guide

PDF for subscribers

Take this guide with you

Every section, table and checklist in one PDF, with links to the sources and related guides. Subscribe to our weekly NHI & AI Identity Journal and we’ll email you a download link.

Free weekly newsletter

Subscribe to the NHI & AI Identity Journal

The latest on NHI and Agentic AI security – articles, research, breaches, news and events every week.

Bonus 33% off our NHI Course when you subscribe.

PDF Downloads for Newsletter Subscribers

Get the guide

Enter your details and we’ll email you a download link.

The full guide is free to read online. The PDF is a thank you for subscribing.

Fill in all fields marked * and tick both boxes to continue.