Clause 6 of ISO/IEC 27001 is where most ISMS nonconformities start, because it turns the context work in Clause 4 into the risk decisions that every control and audit sample depends on. It covers actions to address risks and opportunities, the information security risk assessment and risk treatment processes, the Statement of Applicability (SoA), information security objectives and, since the 2022 edition, planning of changes. This guide explains each sub-clause in plain terms, what auditors look for, how the 2022 edition changed Clause 6, and gives a scored self-check you can run before a certification or surveillance audit. It is for ISMS managers and risk owners who already know the basics from the ISO 27001 Certification Guide. The requirements are paraphrased, not quoted: buy the standard from ISO or your national body for the authoritative text.
Status checked 27 November 2026: ISO/IEC 27001:2022 (third edition, published 25 October 2022, with Amendment 1:2024 on climate action) is the current edition, and the accreditation transition from the 2013 edition ended on 31 October 2025.
Key takeaways
- Clause 6 has five working parts. 6.1.1 general risk and opportunity planning, 6.1.2 risk assessment, 6.1.3 risk treatment and the SoA, 6.2 objectives and 6.3 planning of changes.
- Criteria come before assessment. Risk acceptance criteria and criteria for performing assessments must be set first, so repeated assessments give consistent, valid and comparable results.
- Annex A is a cross-check, not the starting list. The 2022 wording makes clear you determine necessary controls from any source, then compare them with Annex A so nothing necessary is missed.
- Objectives must be monitored. The 2022 edition aligned 6.2 with the harmonized structure, and auditors expect evidence that objectives are tracked, not only written.
- 6.3 is the new requirement. Changes to the ISMS must be carried out in a planned way, which auditors test by sampling real changes.
What Clause 6 requires
Clause 6 sits in the Plan stage of the management system. It takes the issues (4.1), interested party requirements (4.2) and scope (4.3) and turns them into a plan. The table summarises each sub-clause, the documented information that is mandatory, and what auditors usually sample. For the full list of required documents across the standard, see the ISO 27001 Mandatory Documents and Records Guide.
| Sub-clause | What it asks for (paraphrased) | Mandatory documented information | Typical audit evidence |
|---|---|---|---|
| 6.1.1 General | Determine risks and opportunities from context and interested parties; plan actions and how to integrate and evaluate them | None specified | Link from context analysis to risks and to the ISMS plan |
| 6.1.2 Information security risk assessment | Define and apply a repeatable assessment process with acceptance criteria, risk owners, analysis and evaluation | The risk assessment process | Method document, criteria, risk register, dated assessment records |
| 6.1.3 Information security risk treatment | Select treatment options, determine necessary controls, compare with Annex A, produce SoA and treatment plan, get owner approval | The risk treatment process; the SoA | SoA, risk treatment plan, owner sign-off of residual risk |
| 6.2 Objectives and planning to achieve them | Set measurable objectives consistent with the policy, monitor and communicate them, plan how to achieve them | Information on the objectives | Objective list with targets, owners, dates and progress data |
| 6.3 Planning of changes | Carry out changes to the ISMS in a planned manner | None specified | Change records for scope, process, tool or organisation changes |
Clause 6 is the plan; Clause 8 is doing it. Clause 8.2 performs risk assessments at planned intervals and on significant change, and 8.3 implements the treatment plan, both with retained results. Auditors often raise a Clause 6 finding when the real problem is that 8.2 and 8.3 have not kept the plan current.
6.1 Actions to address risks
6.1.1 is broader than information security risk. It asks what could stop the ISMS achieving its intended outcomes, what could cause undesired effects, and what opportunities support continual improvement. Examples that belong here and not in the asset risk register: losing the only person who runs the ISMS, a planned migration to a new cloud provider, a customer demand for certification by a fixed date, or new regulation such as NIS2.
- Input: the issues and interested party requirements from 4.1 and 4.2. Since Amendment 1:2024, that includes whether climate change is a relevant issue; see the ISO 27001 Climate Change Amendment Guide.
- Output: planned actions, built into ISMS processes, with a way to evaluate whether they worked.
- Common gap: organisations treat 6.1.1 as covered by the risk register, so management system risks and opportunities are never recorded.
Risk assessment
6.1.2 defines the process, not a method. Any method is acceptable if it meets these elements.
| Element | What good looks like | Frequent weakness |
|---|---|---|
| Risk acceptance criteria | Approved threshold, for example "risks scored 12 or above need treatment or executive acceptance" | Threshold exists but nobody approved it |
| Criteria for performing assessments | Defined likelihood and impact scales with anchors (financial bands, records affected, downtime) | Scales with words only ("high", "medium") and no definitions |
| Consistent, valid, comparable results | Same method each cycle, calibration across assessors | Each department scores differently |
| Risk identification | Risks to confidentiality, integrity and availability of information in scope | Only IT systems considered; suppliers, people and processes missing |
| Risk owners | Named people with authority to accept or fund treatment | The CISO owns every risk |
| Analysis | Consequence and likelihood assessed, giving a level | Scores copied from last year |
| Evaluation and prioritisation | Results compared with criteria and ranked for treatment | No link from score to decision |
ISO/IEC 27005:2022 (fourth edition, October 2022) gives guidance on managing information security risks in support of an ISO/IEC 27001 ISMS, adapting ISO 31000 principles. It is guidance, not a certification requirement. Asset-based and scenario-based identification both work; scenario-based registers are usually shorter and easier for risk owners to read. Include machine identities explicitly: a risk such as "unowned service account credentials give persistent access to production" is a common audit discussion point. See the Risk Register Template and the ISO 31000 Risk Management Guide.
Risk treatment and the SoA
6.1.3 turns assessed risks into decisions. Its sub-items run in order:
- a) Select treatment options: modify the risk with controls, retain it, avoid it or share it. See Accept vs Transfer vs Mitigate vs Avoid.
- b) Determine necessary controls: from any source: Annex A, ISO/IEC 27002, NIST, sector rules or your own designs.
- c) Compare with Annex A: check that no necessary control has been omitted. The 2022 notes removed control objectives and refer to "information security controls"; Annex A is the reference set for this comparison.
- d) Produce the SoA: list the necessary controls, why each is included, whether it is implemented, and why any Annex A control is excluded. The 2022 edition reorganised this wording to remove ambiguity; the requirement itself is unchanged.
- e) Formulate the risk treatment plan: actions, owners, resources and dates.
- f) Obtain approval: risk owners approve the plan and accept residual risks.
The SoA and the treatment plan answer different questions: the SoA says which controls apply and their status; the plan says what will be done, by whom and when. See Risk Treatment Plan vs Statement of Applicability, the ISO 27001 Statement of Applicability Template and the Risk Treatment Plan Template. Traceability is what auditors test: pick a risk, follow it to controls, find those controls in the SoA, then find evidence they operate. Pick an excluded control and check the justification ties to scope or risk.
6.2 Objectives
Information security objectives must be consistent with the information security policy, measurable where practicable, take account of requirements and risk results, be monitored, communicated and updated, and be available as documented information. Planning must say what will be done, with what resources, who is responsible, when it will be complete and how results are evaluated. IAF MD 26 records that 6.2 d) was revised in the 2022 edition to align with the harmonized structure for management system standards.
| Weak objective | Better objective | Evidence source |
|---|---|---|
| Improve access control | Remove 100% of leaver accounts within 24 hours by Q2, measured monthly | Identity system reports against HR leaver feed |
| Reduce vulnerabilities | Fix critical internet-facing vulnerabilities within 14 days, 95% compliance by year end | Vulnerability scanner SLA report |
| Manage service accounts better | Every service account has a named owner and a credential rotated within 90 days by Q3 | Non-human identity inventory |
| Raise awareness | Phishing report rate above 60% in quarterly simulations | Simulation platform results |
Objectives feed Clause 9: monitoring and measurement (9.1) and management review (9.3) should show progress against them.
6.3 Planning of changes
IAF MD 26 lists the new subclause 6.3, planning of changes, among the changes in the 2022 revision: when the organisation needs to change the ISMS, the change must be carried out in a planned manner. The standard does not prescribe a method, so keep it proportionate.
- What counts as an ISMS change: scope changes, new sites or business units, mergers, outsourcing a process, replacing a core security tool, reorganising roles, or a major change to the risk method.
- What a proportionate plan records (good practice, not prescribed text): purpose and expected consequences, effect on existing controls and risks, resources, responsibilities and approval.
- How it differs from Annex A 8.32 Change management: 8.32 covers changes to information processing facilities and systems; 6.3 covers changes to the management system itself. Many organisations run both through one change process with an "ISMS impact" field.
- Audit test: the auditor asks what changed since the last visit and asks to see how each change was planned.
Self-check questions
Score each question 0 (no evidence), 1 (partly in place or not evidenced) or 2 (in place with evidence an auditor would accept). Twelve questions give a maximum of 24.
| # | Sub-clause | Question |
|---|---|---|
| 1 | 6.1.1 | Are ISMS-level risks and opportunities recorded and traced to 4.1 and 4.2? |
| 2 | 6.1.1 | Is there evidence that planned actions were evaluated for effectiveness? |
| 3 | 6.1.2 | Are risk acceptance criteria documented and approved by management? |
| 4 | 6.1.2 | Do likelihood and impact scales have defined anchors used by every assessor? |
| 5 | 6.1.2 | Does every risk have a named owner with authority to accept it? |
| 6 | 6.1.2 and 8.2 | Was the last assessment dated within the planned interval and repeated after significant change? |
| 7 | 6.1.3 | Can you trace three sampled risks to controls, SoA entries and operating evidence? |
| 8 | 6.1.3 | Does every excluded Annex A control have a justification tied to scope or risk? |
| 9 | 6.1.3 | Have risk owners signed off the treatment plan and residual risks? |
| 10 | 6.2 | Are objectives measurable, owned, dated and consistent with the policy? |
| 11 | 6.2 and 9.1 | Is progress against objectives monitored and reported to management review? |
| 12 | 6.3 | Were the ISMS changes since the last audit planned and recorded? |
- 20 to 24: ready for audit; fix any 1 scores as minor improvements.
- 14 to 19: likely minor nonconformities; prioritise questions 3, 7 and 9, which auditors sample first.
- Below 14, or any 0 on questions 3, 7, 8 or 9: risk of a major nonconformity; delay the audit or close gaps first.
The bands are an NHI Mgmt Group rule of thumb, not a certification body scale. Track the total each quarter as an ISMS metric alongside: percentage of risks with a named owner, percentage of risks past their review date, treatment plan actions overdue, and objectives on track.
Framework mapping
| Clause 6 element | NIST CSF 2.0 | NIST SP 800-53 Rev. 5 |
|---|---|---|
| 6.1.1 Risks and opportunities | GV.RM-01, GV.RM-03 | PM-9 |
| 6.1.2 Risk assessment and criteria | ID.RA-05, GV.RM-02 | RA-3 |
| 6.1.3 Risk treatment | ID.RA-06 | PM-9, RA-7 |
| 6.2 Objectives | GV.RM-01 | PM-6 |
| 6.3 Planning of changes | ID.RA-07 | CM-3 |
This is an indicative mapping by intent, not an official crosswalk. For a full crosswalk see the NIST CSF to ISO 27001 Mapping Guide.
Common failure patterns
- Starting from Annex A: copying the 93 controls into the SoA and back-filling risks breaks the logic of 6.1.3 and is easy for auditors to spot.
- Criteria nobody approved: acceptance thresholds set by the security team alone, with no management decision recorded.
- Residual risk never accepted: treatment plans exist but risk owners have not signed off what remains.
- Stale assessments: no reassessment after a cloud migration, acquisition or new AI deployment, so the register describes a different organisation.
- Objectives without data: objectives written for the audit but never measured or reviewed.
- No trace of 6.3: scope or tooling changed between audits with no record of how the change was planned.
Practitioner checklist
- Record ISMS-level risks and opportunities separately from the information security risk register and link them to 4.1 and 4.2.
- Get risk acceptance criteria and assessment scales approved by top management and version them.
- Name a risk owner with real authority for every risk, including risks from service accounts, API keys and AI agents.
- Determine controls from any source, then compare against Annex A and record the comparison.
- Keep the SoA, risk register and treatment plan cross-referenced by risk ID and control number.
- Obtain dated risk owner approval of the treatment plan and residual risks.
- Set measurable, owned objectives and report progress to management review.
- Add an ISMS impact step to change management to evidence 6.3.
- Run the 12-question self-check each quarter and before every audit.
Standards and references
- ISO: ISO/IEC 27001 Information security management systems
- ISO: ISO/IEC 27005:2022 Guidance on managing information security risks
- ISO: ISO/IEC 27003 Information security management systems guidance
- IAF: MD 26:2023 Transition Requirements for ISO/IEC 27001:2022
- UKAS: Transition arrangements for ISO/IEC 27001:2022
- INAB: Transition requirements for ISO/IEC 27001:2022
Related NHI Mgmt Group resources: ISO 27001 Certification Guide · ISO 27001 Statement of Applicability Template · ISO 27001 Certification Readiness Checklist · Risk Treatment Plan Template