Join our Newsletter — 33% off our NHI Course
Home› Guides› How ISO Standards Are Made: Stages from NWIP…
Guide Regulations & Frameworks

How ISO Standards Are Made: Stages from NWIP to FDIS and Reading Document Status Codes

PDF for newsletter subscribers · free to read online

← All guides
By NHI Mgmt Group, under the editorial direction of Lalit Choda Updated 27 November 2026 14 min read
On this page

Security teams regularly cite, buy tooling for or plan audits against ISO documents that are still drafts, are being revised, or are only Technical Reports that set no requirements. Every ISO and ISO/IEC document carries a harmonised stage code, from 00.00 for a proposal just received to 60.60 for a published International Standard and 95.99 for a withdrawn one, and reading that code correctly tells you how much the text can still change. This guide explains how ISO and the joint ISO/IEC technical committee JTC 1 develop standards, what each stage and substage code means, how TS, TR and PAS documents differ from International Standards, and how amendments and reviews work under the ISO/IEC Directives, Part 1 as they stand in November 2026. It is written for compliance leads, auditors, architects and anyone tracking information security standards from ISO/IEC JTC 1/SC 27. For the current status of specific standards, see the Security Standards Tracker; this page explains how to read those statuses.

Key takeaways

  • The stage code is the maturity signal. Codes run from 00 (preliminary) through 10, 20, 30, 40, 50 and 60 (publication) to 90 (review) and 95 (withdrawal); only 60.60 means a published International Standard.
  • Substage digits tell you what is happening now. .00 is registration, .20 the start of the main action, .60 its completion, .92 and .93 repeat a phase, .98 abandon and .99 proceed.
  • Not every ISO document is a standard. A Technical Specification can become one, a Technical Report is informative only, and a PAS has a maximum life of six years.
  • The rulebook changed in 2026. A single aligned edition of the ISO/IEC Directives, Part 1 entered into force on 5 October 2026, replacing the separate ISO, IEC and JTC 1 supplements.
  • Drafts are for planning, not certification. Read a DIS or FDIS to prepare, but audit, contract and certify against the published edition and its amendments.

How ISO and IEC JTC 1 work

ISO standards are written by technical committees (TCs) and their subcommittees (SCs), made up of national standards bodies. Participating members (P-members) must vote; observing members (O-members) follow the work. The experts who draft text sit in working groups (WGs) and are nominated by national bodies, so an organisation influences a standard through its national body, such as BSI in the UK, DIN in Germany or ANSI in the US.

Information technology is handled by ISO/IEC JTC 1, a joint technical committee of ISO and the IEC. Its documents carry the ISO/IEC prefix. JTC 1 describes itself as a consensus-based standards body for information technology and lists 24 subcommittees. Security work sits in SC 27.

BodyRoleSecurity examples
ISO/IEC JTC 1Joint ISO and IEC committee for information technologyParent of SC 27 and of SC 42 (artificial intelligence)
ISO/IEC JTC 1/SC 27Information security, cybersecurity and privacy protection; secretariat held by DIN, GermanyISO/IEC 27001, 27002, 27005, 27701, 15408
SC 27 WG 1Information security management systemsThe ISO/IEC 27000 family of ISMS requirements and guidance
SC 27 WG 2Cryptography and security mechanismsEncryption, signatures and key management standards
SC 27 WG 3Security evaluation, testing and specificationCommon Criteria (ISO/IEC 15408) and evaluation methods
SC 27 WG 4Security controls and servicesSector and topic guidance such as incident management and supplier relationships
SC 27 WG 5Identity management and privacy technologiesIdentity frameworks and privacy standards

ISO states that SC 27 covers security requirements, information security management systems, cryptographic mechanisms, identity management and biometrics, conformance assessment and security evaluation criteria. The working group names above are those listed by JTC 1 for SC 27.

Stages from NWIP to publication

The ISO/IEC Directives, Part 1 define seven project stages, each with its own document. The 2026 edition (the 21st) lists them as follows. The table and the thresholds below are taken from a copy of that edition hosted by the US Consumer Technology Association (CTA), not from an ISO web page; the ISO site summarises the stages more briefly, so check the official Directives before relying on a specific figure.

StageStage codeDocumentWhat happens
Preliminary00Preliminary work item (PWI)An idea not yet ready for a project; cancelled if it does not progress to the proposal stage within 24 months
Proposal10New work item proposal (NP, often called NWIP)P-members vote on whether to start the project and commit experts
Preparatory20Working draft (WD)The working group drafts the text
Committee30Committee draft (CD)The committee comments on successive drafts until consensus
Enquiry40Enquiry draft: ISO/DIS or IEC CDVAll national bodies vote and comment
Approval50Final draft International Standard (FDIS)Formal yes or no vote on the final text
Publication60International Standard (ISO, IEC, ISO/IEC or IEC/ISO)Edited and published

Approval thresholds and timings

  • New work item: clause 2.3.5 requires approval by a two-thirds majority of the P-members voting, plus commitments of experts from at least four P-members (committees with 16 or fewer P-members) or five (17 or more).
  • Committee draft: drafts continue until consensus of the P-members as judged by the Chair. The Directives state that sustained opposition is not a right of veto. A CD comment period defaults to eight weeks and can be extended to 16.
  • Enquiry: a 12-week vote. The draft is approved if two-thirds of P-member votes cast are in favour and no more than one quarter of all votes cast are negative.
  • Approval: the FDIS vote uses the same criteria. If the enquiry draft is approved and no technical changes are needed, it can go straight to publication without an FDIS ballot.
  • Skipping the committee stage: the committee stage may be omitted case by case where this does not compromise consensus or quality.
  • Time limit: work items that have not reached approval within 36 months are automatically cancelled, with one extension of up to 12 months possible on request.

In practice this means a security standard often takes about three years from NP to publication, and a document at DIS can still change materially, while an FDIS is close to final.

Reading status codes

A harmonised stage code has two parts: the stage (first two digits) and the substage (last two). ISO's stage code table uses the same substage meanings throughout: 00 registration, 20 start of main action, 60 completion of main action, 92 repeat an earlier phase, 93 repeat current phase, 98 abandon and 99 proceed.

CodeMeaning (ISO stage code table)What it tells a reader
00.00 / 00.20 / 00.60Proposal for new project received / under review / close of reviewIdea only, no draft to read
00.98 / 00.99Proposal abandoned / approval to ballot the proposalDropped, or moving to an NP ballot
10.00 / 10.20 / 10.60Proposal registered / new project ballot initiated / close of votingNational bodies deciding whether to start
10.92 / 10.98 / 10.99Returned to submitter / new project rejected / new project approved10.99 means work starts
20.00 / 20.20 / 20.60Registered in work programme / working draft study initiated / close of comment periodEarly draft, expect large changes
20.98 / 20.99Project deleted / WD approved for registration as CD20.99 means a committee draft is next
30.00 / 30.20 / 30.60CD registered / CD consultation initiated / close of comment periodContent taking shape; structure may still change
30.92 / 30.98 / 30.99CD referred back to WG / project cancelled / CD approved for registration as DIS30.92 means another round of drafting
40.00 / 40.20 / 40.60DIS registered / DIS ballot initiated (12 weeks) / close of votingPublic enquiry draft; good time to plan gap analysis
40.92 / 40.93DIS referred back to TC or SC / decision for new DIS ballotSignificant disagreement; dates will slip
40.98 / 40.99Project cancelled / DIS approved for registration as FDIS40.99 means the final draft is next
50.00 / 50.20 / 50.60FDIS registered / FDIS ballot or proof sent / close of votingNear final; technical content stable
50.92 / 50.98 / 50.99FDIS referred back / project cancelled / approved for publication50.99 means publication within weeks
60.00 / 60.60International Standard under publication / published60.60 is the citable edition
90.20 / 90.60Under systematic review / close of reviewStill valid; outcome pending
90.92 / 90.93 / 90.99To be revised / confirmed / withdrawal proposed by TC or SC90.92 means a new edition is coming; 90.93 means it stays as is
95.20 / 95.60 / 95.92 / 95.99Withdrawal ballot initiated / close of voting / decision not to withdraw / withdrawn95.99 means do not cite for new work

Ballot lengths can differ between sources: ISO's stage code table gives the FDIS ballot as eight weeks and its stages page as two months, while the CTA-hosted copy of the 2026 Directives sets the FDIS vote at six weeks. The stage and substage meanings are what matter for judging maturity.

Prefixes you will see in catalogues

  • ISO/IEC CD 27xxx, ISO/IEC DIS 27xxx, ISO/IEC FDIS 27xxx: the draft stage is part of the reference, so a catalogue entry tells you the stage before you open it.
  • ISO/IEC TS, TR and PAS: the document type is part of the number, for example ISO/IEC TS 27xxx.
  • /Amd 1:2024 or /Cor 1: an amendment or a technical corrigendum to a base edition, read together with it. ISO/IEC 27001:2022/Amd 1:2024 is an example.

Document types

Purposes and the PAS and IWA life rules are from ISO's deliverables help page; the approval rules are from the CTA-hosted copy of the 2026 Directives.

TypePurposeApprovalLifeUse in compliance
International Standard (IS)Rules, requirements, guidelines or test methods, including management system standardsEnquiry and approval votes: two-thirds of P-members in favour, no more than a quarter of votes negativeReviewed under the systematic review rulesCertify, audit and contract against it
Technical Specification (TS)Work still under technical development, or where agreement on an IS is not yet possible; published for use and feedbackTwo-thirds majority of P-members voting; eight-week ballotReviewed; may later become an ISUsable, but expect change
Publicly Available Specification (PAS)A quick, consensus-based specification for urgent market needsSimple majority of P-members voting; eight-week ballotMaximum six years, then converted or withdrawnInterim reference only
Technical Report (TR)Informative material such as survey data or state-of-the-art explanationsSimple majority of P-members voting; eight-week ballotReviewedGuidance only; contains no requirements
International Workshop Agreement (IWA)Developed in workshops outside the committee structureConsensus of workshop participantsReviewed after three years; maximum six yearsRarely used in security compliance

Amendments and revisions

  • Amendment: a partial revision. Only the amended parts are open for comment. Clause 4.6.2 of the 2026 Directives (CTA-hosted copy) allows no more than two amendments to one document; a third change requires a new edition.
  • Correction (corrigendum): only for an error or ambiguity that could lead to incorrect or unsafe application, not for outdated content. ISO publishes the corrigendum and a corrected version.
  • Revision: a new edition that cancels and replaces the previous one. It goes through the full stage sequence again, so a 90.92 decision on a standard you rely on starts a multi-year clock.
  • Systematic review: historically every International Standard was reviewed at least every five years. The 2026 Directives, in the CTA-hosted copy, describe this through a stability date: at most five years after a first edition, and up to 12 years after each confirmation. At the start of each year, documents reaching their stability date are sent to national bodies, and the committee decides to confirm, revise or amend, or withdraw.
  • Transition periods: certification schemes, not ISO, decide how long certificates against a replaced edition stay valid. See the ISO 27001 Certification Guide.

ISO/IEC 27001 shows how this plays out: the 2022 edition is at 60.60 with Amd 1:2024 (climate action changes) published. A Statement of Applicability should cite the edition and the amendment.

Tracking a standard

  1. List the documents you depend on: standards cited in policies, contracts, certifications, supplier questionnaires and tooling, with edition year and any amendments.
  2. Record the stage code: check each document's life cycle on its ISO catalogue page and note the code and date. Anything at 90.92 or with a new project at 20 to 50 is a change coming your way.
  3. Follow the committee: SC 27's work programme on the ISO site lists projects under development with their stage codes. Your national body's mirror committee can give earlier sight of drafts.
  4. Read drafts at DIS: DIS and FDIS texts are sold or circulated for comment by national bodies. Start a gap analysis at DIS, finalise it at FDIS.
  5. Update on publication: change references when the stage reaches 60.60, and plan transitions using the certification scheme's dates.
  6. Review quarterly: a short check of stage codes is enough for most organisations; large regulated firms often assign an owner per standard family.

What to do at each stage

Stage reachedSmall organisationLarge or regulated organisation
10 to 30Note it existsJoin the national mirror committee if it affects your business; comment on CDs
40 (DIS)Read summaries; watch for the FDISBuy or obtain the DIS, start a gap analysis, brief auditors
50 (FDIS)Plan budget and timelineFinalise gap analysis and transition plan
60.60Buy the standard; update policiesUpdate control mappings, contracts and tooling catalogues
90.92Expect a new edition in a few yearsTrack the revision project from its first stage
95.99Stop citing it for new workRetire references and keep only as audit evidence

Common mistakes

  • Certifying or contracting against a DIS: the text can still change at enquiry, and certification bodies audit against published editions.
  • Treating a TR as requirements: a Technical Report informs; it gives an auditor nothing to test.
  • Citing a base edition without its amendment: ISO/IEC 27001:2022 should be read with Amd 1:2024.
  • Reading 90.20 as "being replaced": a standard under review is still valid; only 90.92 signals a revision.
  • Relying on secondary sites: vendor blogs often lag. Check the ISO catalogue page and the committee's work programme.

Practitioner checklist

  • Keep a register of every ISO and ISO/IEC document you depend on, with edition, amendments and current stage code.
  • Treat only 60.60 documents as citable requirements; mark TS, TR and PAS documents as such.
  • Check stage codes quarterly and flag 90.92 decisions and new projects at stages 20 to 50.
  • Start gap analyses at DIS and finalise them at FDIS, not after publication.
  • Cite amendments together with the base edition in policies, contracts and the Statement of Applicability.
  • Use certification scheme transition dates, not ISO publication dates, to plan certificate changes.
  • Engage through your national standards body if a draft materially affects your organisation.
  • Note that procedures follow the 2026 single aligned edition of the ISO/IEC Directives, Part 1 when reading older guidance.

Standards and references

Related NHI Mgmt Group resources: Security Standards Tracker · ISO 27001 Certification Guide · ISO/IEC 27099 PKI Practices and Policy Framework Guide · ISO 27001

PDF for subscribers

Take this guide with you

Every section, table and checklist in one PDF, with links to the sources and related guides. Subscribe to our weekly NHI & AI Identity Journal and we’ll email you a download link.

Free weekly newsletter

Subscribe to the NHI & AI Identity Journal

The latest on NHI and Agentic AI security – articles, research, breaches, news and events every week.

Bonus 33% off our NHI Course when you subscribe.

PDF Downloads for Newsletter Subscribers

Get the guide

Enter your details and we’ll email you a download link.

The full guide is free to read online. The PDF is a thank you for subscribing.

Fill in all fields marked * and tick both boxes to continue.