NIS2 Article 21(2)(c) obliges essential and important entities to cover business continuity, backup management, disaster recovery and crisis management, yet the Directive itself says very little about what good looks like. The detail sits in Commission Implementing Regulation (EU) 2024/2690, whose Annex section 4 turns one line of the Directive into fourteen numbered requirements, and in ENISA's technical implementation guidance, which adds examples of evidence. This guide walks through those requirements point by point and shows the evidence a supervisor or auditor will expect to see. It is written for compliance, resilience and IT continuity leads who already know the NIS2 basics. For scope, the ten measures, reporting and fines, see the NIS2 Directive Guide.

Key takeaways

  • One clause, three disciplines. Article 21(2)(c) covers "business continuity, such as backup management and disaster recovery, and crisis management", and the Implementing Regulation splits this into section 4.1 (plan), 4.2 (backup and redundancy) and 4.3 (crisis management).
  • The business impact analysis drives everything. Point 4.1.3 requires a BIA, and recovery order, recovery objectives and backup frequency all have to trace back to it.
  • Backups must be proven, not assumed. Points 4.2.3 and 4.2.6 require regular integrity checks and regular, documented restore testing with corrective action.
  • Crisis management includes the authorities. Point 4.3.2 expects the crisis process to cover communication with competent authorities, and point 4.3.3 expects a process for handling information received from CSIRTs.
  • Undocumented exceptions count against you. Article 2 of the Regulation says that where a requirement is qualified "where appropriate" and you decide it does not apply, you must document your reasoning.

What Article 21(2)(c) requires

Article 21(1) of Directive (EU) 2022/2555 requires essential and important entities to take "appropriate and proportionate technical, operational and organisational measures" to manage risks to their network and information systems. Article 21(2) lists the minimum measures, and point (c) reads: "business continuity, such as backup management and disaster recovery, and crisis management". Under Article 20(1), the management body approves these measures and oversees their implementation, so continuity is a board matter, not only an IT one.

The Directive is transposed into national law, so the exact wording you are audited against is your national act and any national guidance. Many Member States copy Article 21(2) closely; some add detail. Check your national implementation first: the country guides linked from the NIS2 Directive Guide cover this.

Element of 21(2)(c)What it means in practiceWhere the detail sits
Business continuityKeeping critical services running or restoring them within agreed objectives after an incidentImplementing Regulation Annex 4.1
Backup managementComplete, accurate, protected and tested copies of data and configurationAnnex 4.2.1 to 4.2.3, 4.2.6
Disaster recoveryRestoring network and information systems in a planned order, with redundancy where the risk justifies itAnnex 4.1.2, 4.2.4, 4.2.5
Crisis managementDeciding and communicating under pressure, including with authorities and CSIRTsAnnex 4.3

Implementing Regulation 2024/2690 detail

Implementing Regulation (EU) 2024/2690 of 17 October 2024 entered into force on 7 November 2024. Article 1 states that it lays down "the technical and the methodological requirements of the measures referred to in Article 21(2)". It applies directly to a defined group of digital providers: DNS service providers, TLD name registries, cloud computing service providers, data centre service providers, content delivery network providers, managed service providers, managed security service providers, providers of online marketplaces, online search engines and social networking services platforms, and trust service providers. For other sectors it is not legally binding, but it is the most detailed official statement of what Article 21(2)(c) means, and national authorities and auditors use it as a reference point. The NIS2 Implementing Regulation 2024/2690 Guide covers the Regulation as a whole.

Article 2 sets two rules that shape how you apply section 4. First, the level of security must be "appropriate to the risks posed", taking into account exposure, size and the likelihood and severity of incidents. Second, where the Annex says "where appropriate", "where applicable" or "to the extent feasible" and you conclude a point does not apply, you must document why in a comprehensible way.

Section 4.1: the business continuity and disaster recovery plan

  • 4.1.1: lay down and maintain a business continuity and disaster recovery plan to apply in the case of incidents.
  • 4.1.2: the plan is based on the risk assessment in point 2.1 and, where appropriate, covers purpose and scope, roles and responsibilities, key contacts and communication channels, activation and deactivation conditions, recovery order, recovery objectives for specific operations, required resources, and the return from temporary measures to normal operations.
  • 4.1.3: carry out a business impact analysis and use it to set continuity requirements for network and information systems.
  • 4.1.4: test, review and update the plans at planned intervals and after significant incidents or changes, and incorporate lessons learnt.

BIA, RTO, RPO and SDO

ENISA's guidance on point 4.1 asks entities to derive recovery objectives from the BIA and names three of them. Use them consistently across the plan, backup schedules and test reports, because a test result only means something when compared with a stated objective.

ObjectiveENISA descriptionHow it is used
RTO (recovery time objective)Maximum time to recover resources or functionsSets recovery order and the target each DR test is measured against
RPO (recovery point objective)Maximum acceptable data lossSets backup and replication frequency per system
SDO (service delivery objective)Minimum performance level during alternate processingSizes failover capacity and degraded-mode operation

A practical BIA for NIS2 starts from the services you provide that bring you into scope, maps each to the systems, data, people, suppliers and identities it depends on, and records the impact of loss over time. The Business Impact Analysis Template gives a working format, and the Business Impact Analysis vs Cyber Risk Assessment guide explains how the BIA and the point 2.1 risk assessment fit together.

Backup requirements

Section 4.2 of the Annex is the most prescriptive part of 21(2)(c). Its six points are:

  • 4.2.1: maintain backup copies of data and provide sufficient resources (facilities, systems and staff) for an appropriate level of redundancy.
  • 4.2.2: backup plans set recovery times and ensure copies are complete and accurate, including configuration data and data stored in cloud services, and cover offsite storage, access controls matched to asset classification, restoration, and retention periods.
  • 4.2.3: perform regular integrity checks on the backup copies.
  • 4.2.4: based on the risk assessment and continuity plan, ensure at least partial redundancy of systems, assets, personnel and communication channels.
  • 4.2.5: take backup and redundancy requirements into account when monitoring and adjusting resources.
  • 4.2.6: carry out regular testing of the recovery of backup copies and redundancies, document the results and take corrective action where needed.

What ENISA adds

  • Separation: copies stored online or offline in a safe location separate from the source network, far enough away to survive a site disaster.
  • 3-2-1: ENISA's tips cite the 3-2-1 rule: three copies of data, on two different media types, with one copy offsite.
  • Clean restore: identify "patient zero" before restoring so you do not restore the infection.
  • Test frequency: ENISA suggests high-criticality data weekly, moderate and low criticality monthly, and immediately after significant changes.

The ENISA test frequencies are guidance, not law. If your cadence differs, record the rationale against the BIA, in line with Article 2. For design choices between immutable object storage, offline media and vaults, see Immutable Backups vs Offline Backups and the Backup Security and Immutable Backup Guide.

Where identity fits

Backup platforms run on powerful non-human identities: backup service accounts with read access to everything, API keys for cloud snapshots, and admin consoles that can shorten retention or delete vaults. Ransomware operators target these to inhibit recovery (ATT&CK T1490 Inhibit System Recovery) before encrypting data (T1486 Data Encrypted for Impact). The access controls required by point 4.2.2 should therefore include a separate administrative identity plane for backups, phishing-resistant MFA and multi-person approval for deletion or retention changes, and short-lived or vaulted credentials for backup agents. Recovery also needs identity: if your directory is encrypted, nothing else can authenticate. The Identity Recovery Guide covers rebuilding the identity tier first.

Crisis management

Section 4.3 requires a crisis process distinct from day-to-day incident handling:

  • 4.3.1: put in place a process for crisis management.
  • 4.3.2: the process covers roles and responsibilities (including suppliers where relevant), communication with competent authorities, and measures to maintain security during crises. Information flows with authorities include both mandatory reports and voluntary communications.
  • 4.3.3: implement a process for handling information from CSIRTs or competent authorities about incidents, vulnerabilities, threats and mitigation measures.
  • 4.3.4: test, review and, where appropriate, update the crisis management plan regularly or after significant incidents or changes.

Building the crisis team

ENISA suggests defining explicit criteria for declaring a crisis, including significant risk to critical assets, significant business disruption, breadth across systems or locations, reputational impact, impact on confidentiality, integrity, authenticity and availability, threat actor sophistication and potential for escalation. Its examples of evidence include a list of crisis team members with roles, contacts and alternates.

RoleTypical holderCrisis responsibility
Crisis leadExecutive with authority to commit budget and accept riskDeclares and stands down the crisis, makes business decisions
Technical response leadCISO or head of IT operationsLinks crisis decisions to incident response and recovery order
Regulatory and legal leadLegal counsel or compliance officerTracks Article 23 reporting deadlines and authority communications
Communications leadHead of communicationsCustomer, staff and media messages through agreed channels
CSIRT contact pointNamed security analyst with deputyReceives, validates and routes CSIRT and authority information (4.3.3)
Supplier liaisonProcurement or vendor managementEngages cloud, MSP and other critical suppliers named in the plan

ENISA recommends keeping physical copies of continuity plans so they can be reached during outages. Reporting deadlines under Article 23 are covered in the NIS2 Directive Guide; the crisis process should simply make sure someone owns them. For the wider discipline, see the Crisis Management Guide, and for EU-level coordination the EU Cyber Blueprint Guide.

Evidence to keep

The table maps each Annex point to the evidence ENISA lists or that follows directly from the requirement, plus the related control in common frameworks. Keep evidence dated and versioned; a plan with no review history is weak evidence even if its content is good.

Annex pointEvidenceNIST SP 800-53 / CSF 2.0
4.1.1 to 4.1.2 planApproved BC/DR plan with scope, roles, activation criteria, recovery order and objectives; list of relevant disasters and recovery capabilitiesCP-2 / ID.IM-04
4.1.3 BIADocumented BIA with RTO, RPO and SDO per serviceCP-2 / GV.OC-04
4.1.4 testingTest schedule, test records, activation logs, lessons-learnt actions closedCP-4 / ID.IM-04
4.2.1 to 4.2.2 backupsBackup plans and restoration procedures, backup software logs, configuration showing copies on separate media and offsite, encryption and access settings, retention schedule, cloud supplier SLAsCP-9 / PR.DS-11
4.2.3 integrityRecords of checksum or hash verification and malware scans of backupsCP-9 / RC.RP-03
4.2.4 to 4.2.5 redundancyDescription of redundant systems, ISPs, power and communication channels; capacity reviewsCP-2, CP-10
4.2.6 restore testsTest programme, post-test reports showing achieved recovery time against RTO, corrective actionsCP-4, CP-10 / RC.RP-01
4.3.1 to 4.3.2 crisis processApproved crisis process, crisis team list with alternates, communication plan, crisis resource inventoryIR-4 / RC.CO-03
4.3.3 CSIRT informationNamed contact point, records of CSIRT communications and how they were actionedIR-4
4.3.4 crisis testingExercise scenarios, participants, after-action reports, corrective actionsCP-4 / ID.IM-04

On ISO/IEC 27001:2022, the closest Annex A controls are ICT readiness for business continuity, information security during disruption, and information backup. The ISO 27001 to NIS2 and DORA Mapping Guide covers the crosswalk, and ENISA's guidance points to ISO 22301, ISO 22313 and NIST SP 800-34 for the plan and ISO 22361 for crisis management. If you already hold ISO 22301 certification, see the ISO 22301 Business Continuity Guide; certification helps but does not by itself prove the backup testing in 4.2.6.

Measuring it

  • Restore success rate: share of scheduled restore tests that complete and pass integrity checks, by criticality tier.
  • RTO attainment: achieved recovery time in the last test as a percentage of the RTO, per critical service.
  • Backup coverage: share of in-scope systems, including configuration and SaaS or cloud data, with a backup that meets its RPO.
  • Immutable copy coverage: share of critical data with at least one immutable or offline copy.
  • Exercise follow-through: share of lessons-learnt actions from BC/DR and crisis exercises closed by their due date.

Common failure patterns

  • A BIA written once and never revisited. Services, suppliers and cloud dependencies change; point 4.1.4 expects updates after significant changes, and stale objectives make every test meaningless.
  • Backups without configuration. Point 4.2.2 explicitly includes configuration data and cloud data. Entities that back up file shares but not firewall, identity, infrastructure-as-code or SaaS tenant configuration cannot rebuild in time.
  • Backups reachable from the production identity plane. If the same domain admin or cloud root credentials can delete backups, one compromise ends recovery. Separate admin identities and immutability close this gap.
  • Restore tests limited to single files. ENISA's guidance expects scheduled tests covering both full-system and individual-file recovery. A file restore says nothing about whether a full service meets its RTO.
  • Crisis plans that rely on email and chat. When the tenant or network is compromised, the crisis team cannot meet. Keep out-of-band channels and offline contact lists, and test them.
  • Silent exceptions. Deciding that redundancy for a system is not appropriate is allowed, but Article 2 requires the reasoning to be documented. An undocumented gap reads as non-compliance.

Practitioner checklist

  • Confirm which national act transposes Article 21(2)(c) for you and whether Regulation 2024/2690 applies directly to your entity type.
  • Complete or refresh the BIA and record RTO, RPO and SDO for every in-scope service.
  • Check that the BC/DR plan covers every element listed in point 4.1.2, and get management body approval under Article 20.
  • Extend backup scope to configuration data, identity systems and cloud or SaaS data, with at least one immutable or offline copy of critical data.
  • Move backup administration to separate identities with phishing-resistant MFA, and protect deletion and retention changes with multi-person approval.
  • Run integrity checks and restore tests on a cadence linked to criticality, and record achieved times against RTO.
  • Name the crisis team with alternates, define declaration criteria and name the CSIRT contact point.
  • Exercise the crisis process at least annually, including suppliers, and close the lessons-learnt actions.
  • Document every "where appropriate" decision not to apply an Annex point, with the reasoning.

Standards and references

Related NHI Mgmt Group resources: NIS2 Directive Guide · NIS2 Implementing Regulation 2024/2690 Guide · Business Continuity and Disaster Recovery Guide · Backup Security and Immutable Backup Guide. This guide summarises Article 21(2)(c) of Directive (EU) 2022/2555 and Annex section 4 of Implementing Regulation (EU) 2024/2690 and is not legal advice.

Free weekly newsletter

Subscribe to the NHI & AI Identity Journal

The latest on NHI and Agentic AI security – articles, research, breaches, news and events every week.

Bonus 33% off our NHI Course when you subscribe.