Badge access tends to accumulate for years after logical access has been cleaned up, so former staff, finished contractors and people who changed roles can still open doors to data rooms and network closets. This template gives facilities, physical security and identity governance teams a repeatable procedure for recertifying who can open which doors, zones and access levels in a physical access control system (PACS). It covers scoping and frequency, preparing the PACS and HR data, reviewing door groups and badge holders, handling orphan and shared badges, reconciling leavers, and keeping evidence for audits under NIST SP 800-53 PE-2, PCI DSS Requirement 9 and ISO/IEC 27001:2022 Annex A.7. It does not cover reader, controller or credential hardening; for that see the Physical Access Control Systems Security Guide. Replace the bracketed placeholders and adopt the numbered sections as your procedure.
How to use this template
- Adopt the numbered sections as the [Organisation] physical access review procedure, replacing every [placeholder] with your own values, roles and system names.
- Set frequencies by zone tier in Section 2 before the first review; the defaults shown are starting points, not requirements of any standard, except where a section cites one.
- Run the stage checklist in the Implementation guidance as the working list for each review cycle, and file its completed copy as audit evidence.
- Use the same evidence standard as logical reviews: if your logical access reviews already follow the Access Review Checklist, align reviewer roles, sign-off and retention so auditors see one programme.
1. Purpose
1.1 This procedure ensures that physical access to [Organisation] facilities, and in particular to areas holding information systems, is authorised, appropriate to each person's current role, and removed when no longer required.
1.2 It implements the review element of physical access authorisation: maintaining a list of individuals with authorised access, reviewing that list at a defined frequency, and removing individuals when access is no longer required (NIST SP 800-53 Rev. 5 PE-2).
1.3 It produces evidence that reviews took place, who approved each decision and what was removed, for internal audit, PCI DSS assessments and ISO/IEC 27001 certification audits.
2. Scope and frequency
2.1 In scope: every credential in the PACS (badges, mobile credentials, PIN-only codes, biometric enrolments), every access level, door group and zone, physical keys and combinations recorded in the key register, and visitor and temporary badges.
2.2 Populations: employees, contractors and agency staff, third-party service personnel (cleaning, maintenance, landlord, security guard force), visitors, and non-person credentials such as shared or generic badges assigned to a function.
2.3 Zone tiers and frequency: classify every door group into a tier and review at the frequency below, or more often where [Organisation] risk assessment requires.
| Tier | Example areas | Default review frequency | Reviewer | Additional trigger reviews |
|---|---|---|---|---|
| Tier 1: high risk | Data centres, server and network rooms, cardholder data environment rooms, cash and secure storage, key safes, security control room | [Quarterly] | Zone owner plus [Head of Physical Security] | Any security incident in the zone; change of zone owner |
| Tier 2: restricted | Finance and HR floors, labs, telecoms closets, loading docks, plant rooms | [Every six months] | Zone owner | Reorganisation affecting the area |
| Tier 3: general | Office floors, building entrances, car parks | [Annually] | Line managers through the IGA campaign | Office move or site closure |
| Visitor and temporary | Visitor badges, day passes, temporary contractor badges | [Monthly reconciliation] | Reception or security operations lead | Any unreturned badge |
3. Roles and responsibilities
- Review owner [Physical Security Manager]: schedules campaigns, prepares data, tracks completion and owns evidence.
- Zone owner: a named business owner for each Tier 1 and Tier 2 door group who decides whether each holder still needs access. Zone owners must not approve their own access.
- Line manager: confirms Tier 3 access and role changes for direct reports.
- Contract or vendor owner: confirms access for each contractor and third-party company they sponsor.
- PACS administrator: exports data and executes removals; must not act as reviewer for zones they administer.
- IGA team: supplies the authoritative identity data, runs campaigns where the PACS is connected to the IGA platform and correlates findings with logical access reviews.
- Internal audit: samples completed reviews for evidence quality.
4. Preparing the data (PACS export, HR feed)
4.1 Export from the PACS on the review start date, and record the export time and the person who ran it. The export must include, for each credential: credential number, holder name and unique identifier, holder type, assigned access levels or door groups, activation and expiry dates, status, last use date and time, and issuing site.
4.2 Export the access level definitions: for each access level or door group, the doors it contains, the schedules (time zones) attached and the zone tier.
4.3 Obtain the authoritative identity feeds: the HR extract of active employees with role, department, manager, location and status; the contractor register with sponsor and end date; and the leaver list since the previous review with leaving dates.
4.4 Match records on a unique identifier (employee number or identity ID), not on name. Flag every credential that does not match exactly one active identity.
4.5 Validate completeness and accuracy: reconcile the credential count in the export with the PACS dashboard, and record the result.
4.6 Pre-flag exceptions for reviewers using the table below, so reviewers spend time on decisions rather than searching.
| Flag | Rule | Default action |
|---|---|---|
| Orphan credential | No matching active HR or contractor record | Suspend now; remove after [5] working days unless an owner claims it |
| Leaver still active | Holder appears on the leaver list with a leaving date before the export | Revoke immediately; raise a leaver process incident |
| Dormant credential | No use for [90] days | Reviewer must justify or remove |
| Dormant Tier 1 access | Holder has a Tier 1 level but no Tier 1 door use for [60] days | Remove the Tier 1 level by default |
| Shared or generic credential | Holder name is a function, team or "spare" | Review under Section 7 |
| Expired contractor | Contract end date has passed or is missing | Suspend until sponsor confirms |
| Excess access | Access levels outside the holder's role profile or site | Reviewer decision required |
5. Reviewing door groups and zones
5.1 Review the structure before the people. For each Tier 1 and Tier 2 access level, the zone owner confirms that the doors in the level still match its name and purpose, that no Tier 1 door has been added to a general level, and that schedules are appropriate (for example, Tier 1 access limited to [working hours] unless a role requires otherwise).
5.2 Check for access level sprawl: levels with one holder, levels with overlapping door sets, and "all doors" or master levels. Master levels are restricted to [named security roles] and reviewed at every Tier 1 cycle.
5.3 Reconcile physical keys: compare the key register with holders for keys that open Tier 1 and Tier 2 areas, and change keys or combinations when a holder leaves without returning a key or a combination is compromised, as PE-3 expects.
6. Reviewing badge holders, contractors and visitors
6.1 Employees: for each holder of a Tier 1 or Tier 2 level, the zone owner records one decision: keep, remove or change. Access must be based on job function; "has always had it" is not a justification.
6.2 Movers: holders whose department, role or site changed since the last review must have each access level re-justified. Movers are the most common source of excess physical access.
6.3 Contractors and third parties: each sponsor confirms every contractor they sponsor. Every contractor credential must carry an expiry date no later than the contract end date, and a maximum validity of [six months] before re-approval.
6.4 Visitors: reconcile visitor badges issued against those returned or deactivated, confirm visitor badges expire automatically, and confirm the visitor log is complete and retained for the required period. PCI DSS Requirement 9 sets controls for visitor identification, visitor badges and visitor logs; check the current standard for exact requirements and retention periods. PE-8 expects visitor access records to be maintained and reviewed and anomalies reported.
7. Orphan, shared and anomalous badges
7.1 Orphan badges (no matching active identity) are suspended at the start of the review. Each must be claimed and matched to a person within [5] working days or removed.
7.2 Shared badges (assigned to a team, function or "spare" pool) break individual accountability. They are prohibited for Tier 1 areas. Where operationally unavoidable elsewhere, each shared badge has a named owner, a sign-out log recording who held it and when, and an expiry date.
7.3 Anomalies found during review (credentials used outside schedule, use after a leaving date, repeated access denials at Tier 1 doors) are passed to [Security Operations] for investigation rather than fixed silently, because they may indicate misuse.
8. Leaver reconciliation
8.1 Compare every leaver since the previous review with the PACS export. Any leaver with an active credential after their leaving date is a control failure, regardless of whether the credential was used.
8.2 For each failure, record when access should have been removed, when it was removed, and whether the credential was used after the leaving date (from PACS event history). Report use after leaving to [Security Operations] and [HR].
8.3 Physical access for leavers is revoked [on the leaving date, at the time of departure]; for involuntary leavers, before or during the exit meeting. PCI DSS Requirement 9 expects physical access to sensitive areas to be removed when no longer needed, including on termination; PS-4 expects access to be revoked on termination.
8.4 Confirm that badges were physically returned; record unreturned badges as disabled and lost.
8.5 Fix the root cause: if the HR to PACS integration did not fire, raise it with the IGA team. See the Joiner-Mover-Leaver Guide.
9. Remediation and evidence
9.1 Remediation deadlines: removals decided in a review are completed within [2] working days for Tier 1, [5] for Tier 2 and [10] for Tier 3. Leavers and orphans are actioned immediately.
9.2 Verify removal by taking a second PACS export after remediation and confirming each removed access level is gone. Do not close the review on the basis of tickets alone.
9.3 Evidence pack: for each review cycle retain the items below for [the longer of three years or the audit cycle], or as [Organisation] retention schedules require.
| Evidence item | Why auditors ask for it | Framework link |
|---|---|---|
| Dated PACS export and completeness check | Shows the full population was reviewed | PE-2; ISO A.5.18 |
| Access level definitions with doors and tiers | Shows reviewers knew what they were approving | PE-3; ISO A.7.2 |
| Reviewer decisions with name, date and justification | Demonstrates the review actually happened | PE-2; ISO A.5.18; PCI DSS Req 9 |
| Leaver reconciliation results and exceptions | Tests timeliness of revocation | PS-4; PCI DSS Req 9 |
| Post-remediation export | Proves removals were executed | PE-2 |
| Visitor log and badge reconciliation | Visitor control evidence | PE-8; PCI DSS Req 9 |
| Physical access monitoring records for sensitive areas | PCI DSS Requirement 9 sets retention expectations for these; check the current standard for the period | PE-6; ISO A.7.4 |
| Sign-off by review owner and Tier 1 zone owners | Accountability | ISO A.5.18 |
9.4 Protect evidence as records: store it in [repository] with access restricted to the review team and audit, because PACS exports contain personal data and movement history. Apply [Organisation] privacy rules on retention of access event data; see the CCTV and Video Surveillance Privacy Guide where camera records are involved.
10. Linking physical and logical access reviews
10.1 Where possible, connect the PACS to the IGA platform so physical access levels appear as entitlements and are reviewed in the same campaign as application access. This puts physical and logical decisions in front of the same manager with the same context.
10.2 Correlate the two reviews: a person removed from a data centre door group should normally lose console or out-of-band management access to the equipment in that room, and a person losing privileged infrastructure access should be checked for Tier 1 physical access.
10.3 Treat PACS administrator accounts and the PACS integration service account as privileged identities and include them in the logical privileged access review. Changes to access levels made by these accounts are reviewed in Tier 1 cycles. See the Access Reviews Guide.
11. Framework mapping
| Procedure section | NIST SP 800-53 Rev. 5 | ISO/IEC 27001:2022 Annex A | PCI DSS v4.0.1 |
|---|---|---|---|
| 2, 5, 6: authorised list and periodic review | PE-2 Physical Access Authorizations | A.7.2 Physical entry; A.5.18 Access rights | Requirement 9.3 |
| 5: access levels, keys and combinations | PE-3 Physical Access Control | A.7.1 Physical security perimeters; A.7.3 Securing offices, rooms and facilities | Requirement 9.2 |
| 6.4: visitors | PE-8 Visitor Access Records | A.7.2 Physical entry | Requirement 9.3 |
| 7.3, 9: monitoring records | PE-6 Monitoring Physical Access | A.7.4 Physical security monitoring | Requirement 9.2 |
| 8: leavers and movers | PS-4 Personnel Termination; PS-5 Personnel Transfer | A.5.18 Access rights | Requirement 9.3 |
| 10: identity lifecycle | AC-2 Account Management | A.5.16 Identity management | Requirement 7 and 8 |
NIST CSF 2.0 places this procedure under PR.AA-06 (physical access to assets is managed, monitored and enforced commensurate with risk), and NIST SP 800-171 Rev. 3 requirements 03.10.01 Physical Access Authorizations and 03.10.02 Monitoring Physical Access apply where controlled unclassified information is held. ISO/IEC 27001:2022 control names above are from Annex A of the 2022 edition.
For the PE family in depth see NIST SP 800-53 PE Physical and Environmental Protection, and for the PCI requirement detail see the PCI DSS Requirement 9 Guide.
Implementation guidance
Checklist by stage
| Stage | Checklist item | Owner | Done |
|---|---|---|---|
| Plan | Zone tiers assigned to every access level; zone owners named and current | Review owner | [ ] |
| Plan | Review calendar issued with deadlines per tier | Review owner | [ ] |
| Prepare | PACS credential export and access level definitions taken and dated | PACS administrator | [ ] |
| Prepare | HR, contractor and leaver feeds obtained; matched on unique ID | IGA team | [ ] |
| Prepare | Completeness check recorded; exception flags applied | Review owner | [ ] |
| Prepare | Orphan credentials suspended | PACS administrator | [ ] |
| Review | Access level structure confirmed for Tier 1 and Tier 2 | Zone owners | [ ] |
| Review | Every Tier 1 and Tier 2 holder decided: keep, remove or change | Zone owners | [ ] |
| Review | Contractors confirmed by sponsors; expiries set | Contract owners | [ ] |
| Review | Shared, spare and visitor badges reconciled | Reception lead | [ ] |
| Review | Leaver reconciliation complete; failures reported | Review owner | [ ] |
| Remediate | Removals executed within tier deadlines | PACS administrator | [ ] |
| Remediate | Post-remediation export confirms removals | Review owner | [ ] |
| Close | Evidence pack filed; sign-offs captured; findings logged | Review owner | [ ] |
Rolling out the procedure
- Pilot one site: run the first cycle on a single site with one Tier 1 room to test exports, matching and reviewer workload.
- Clean the structure first: merge duplicate access levels and assign zone owners before inviting reviewers, otherwise reviewers face hundreds of meaningless levels.
- Remove by suspension first: in the first cycle suspend rather than delete disputed credentials for [5] working days, so an incorrect removal can be reversed without re-enrolment; this is the rollback path.
- Automate leaver revocation from the HR event so reviews find exceptions rather than routine leavers.
Decision guidance for small and large organisations
A small organisation with one building and a cloud PACS can run this procedure from a spreadsheet export twice a year, with the office manager as reviewer and a director signing off Tier 1. A large multi-site organisation should drive reviews from the IGA platform, assign zone owners per site, and run Tier 1 campaigns quarterly with automated leaver reconciliation every day.
Metrics
- Review completion: percentage of Tier 1 and Tier 2 holders reviewed by the deadline.
- Removal rate: percentage of reviewed access removed (a persistently high rate means joiner and mover controls are weak).
- Leaver exceptions: number of leavers with active credentials after their leaving date, and how many were used.
- Remediation time: median days from decision to verified removal, by tier.
Common failure patterns
- Rubber-stamp approvals: zone owners approve whole lists without opening them; require a decision per holder and sample decisions in audit.
- Contractor badges without expiry: sponsors leave and nobody revokes; enforce expiry dates at issue.
- Closing on tickets: removals are ticketed but never executed; verify with a second export.
- Separate physical and logical leaver processes: one fires and the other does not; use a single HR trigger.
Standards and references
- NIST: SP 800-53 Rev. 5, Security and Privacy Controls (PE-2, PE-3, PE-6, PE-8, PS-4)
- PCI Security Standards Council: PCI DSS v4.0.1 Document Library
- NIST: SP 800-171 Rev. 3, Protecting Controlled Unclassified Information (03.10.01, 03.10.02)
- NIST: Cybersecurity Framework 2.0 (PR.AA-06)
- NIST: SP 800-116 Rev. 1, Guidelines for the Use of PIV Credentials in Facility Access
Related NHI Mgmt Group resources: Physical Access Control Systems Security Guide · PCI DSS Requirement 9 Guide · Joiner-Mover-Leaver Guide · Physical Security Site Assessment Checklist · Access Review Checklist