An attacker who can walk into a comms room, plug a device into a meeting room port or collect a laptop from an unlocked desk bypasses most of the technical controls a security team has built. This template sets the rules for physical and environmental security: security zones and what each requires, access authorisation and review, badges and credentials, visitors and contractors, tailgating, CCTV and alarms, data centres and comms rooms, power, fire and water protection, equipment and media handling, and the security of the access control systems themselves. It is written for CISOs, facilities and estates managers, and site security leads; have legal and HR review the CCTV and monitoring clauses before adoption. For the threats and design choices behind it, see the Physical Security Guide for Security Teams.
How to use this template
- Replace text in square brackets, such as [Organisation], [Head of Facilities] and [90 days], with your own terms and values. Bracketed values are suggested defaults, not external requirements.
- "Must" indicates a mandatory requirement. "Should" indicates a recommended practice where a documented exception may be justified.
- Assign every site and room a zone (section 4.1) before applying the rest of the policy. Small offices may only have zones 1 to 3.
- Where premises are shared or managed by a landlord or colocation provider, record which controls the provider operates and how [Organisation] verifies them.
- CCTV and access logs are personal data in many jurisdictions. Section 4.6 assumes a data protection impact assessment; adapt it to local law.
1. Purpose
This policy sets the requirements for protecting [Organisation]'s premises, information, equipment and people from unauthorised physical access, damage, theft and interference, and from environmental threats such as fire, flood and power loss. Its aim is that physical access is granted in proportion to risk, is monitored, and is removed promptly when no longer needed, and that facilities hosting critical systems can withstand foreseeable environmental events.
2. Scope
This policy applies to:
- All premises owned, leased or occupied by [Organisation], including offices, data centres, comms and equipment rooms, warehouses, operational technology sites and shared or serviced offices.
- Colocation and third-party facilities hosting [Organisation] equipment, to the extent [Organisation] controls or contracts for them.
- Physical security systems: access control, CCTV, intruder alarms, visitor management and building management systems.
- Equipment and media containing [Organisation] information, on and off site.
- All employees, contractors, visitors, cleaners, maintenance staff and service providers who enter [Organisation] premises.
Home and remote working locations are covered by [the remote working policy]; see the Remote Access Policy Template.
3. Roles and responsibilities
| Role | Responsibilities |
|---|---|
| [CISO] | Owns this policy jointly with [Head of Facilities]; sets requirements for zones 3 to 5; approves exceptions. |
| [Head of Facilities] | Operates physical controls, guarding and environmental systems; manages landlord and facilities contracts. |
| [Site security lead] per site | Maintains the site zone map; approves access to zone 3 and above; runs visitor management and incident reporting at the site. |
| Zone owners | Approve and review access to their secure areas, for example the data centre manager for the data hall. |
| Line managers | Request access for their staff and confirm removal at leaving or role change. |
| [Security operations] | Receive alarms and access control alerts that indicate a security incident; correlate with cyber events. |
| [Identity or IAM team] | Connect the access control system to HR joiner, mover and leaver events; govern system accounts on physical security platforms. |
| All personnel | Wear badges visibly, prevent tailgating, escort visitors, and report lost badges and suspicious activity immediately. |
4. Policy statements
4.1 Security zones
| Zone | Examples | Minimum entry control | Monitoring |
|---|---|---|---|
| 1: Public | Reception, lobby, public car park | Staffed or monitored reception during opening hours | CCTV at entrances |
| 2: Staff | General office floors, meeting rooms | Badge | Access logs; CCTV at entry points |
| 3: Restricted | Comms rooms, print and post rooms, HR and finance records, labs | Badge plus authorisation by zone owner; locked when unoccupied | Access logs reviewed [monthly]; door held and forced alarms |
| 4: Secure | Data halls, network operations centre, OT control rooms, key and HSM rooms | Badge plus PIN or biometric; anti-passback or interlock where feasible | CCTV recording all entries; alarms monitored [24/7] |
| 5: High security | Safes holding key shares, cages for root CA HSMs | Two-person access; logged sign-in and sign-out | CCTV inside the area; alarm on any entry outside ceremonies |
- Each site must keep a current zone map showing perimeters, entry points, and the controls on each.
- Network ports in zones 1 and 2 must not connect to internal networks without network access control. See the Network Access Control (NAC) Guide.
4.2 Access authorisation and review
- Physical access must be granted on the basis of need, approved by the zone owner for zones 3 to 5, and recorded in the access control system against an individual identity.
- Access must be provisioned and removed automatically from HR joiner, mover and leaver events where the access control system supports it. Leavers' badges must be disabled no later than [the end of their last working day]; immediately for dismissals.
- Access to zones 3 and above must be reviewed by the zone owner at least [quarterly]; zone 2 at least [annually]. Unused access to zones 3 to 5 must be removed after [60 days] without use.
- Generic, shared or unassigned badges must not be used, except numbered temporary badges issued under section 4.4.
4.3 Badges and credentials
- Badges must carry a photo and must be worn visibly in zones 2 and above. Badge technology should use encrypted, mutually authenticated card credentials rather than legacy low-frequency proximity cards that can be copied. See the Physical Access Control Systems Security Guide.
- Lost or stolen badges must be reported within [1 hour] of discovery and disabled at once.
- Mechanical keys must be limited to emergency override, recorded in a key register, and audited at least [annually].
4.4 Visitors and contractors
- All visitors must be pre-registered by a host, sign in with identification, receive a visibly different temporary badge, and be escorted in zones 2 and above.
- Visitors may enter zones 3 and 4 only with zone owner approval and continuous escort; never zone 5 except as approved ceremony witnesses.
- Contractors and cleaners with regular access must be issued individual badges, with access limited to the areas and hours of their contract, and must be included in reviews.
- Visitor records must be kept for [12 months] and then deleted.
4.5 Tailgating
- Personnel must not hold doors for, or allow entry to, anyone who has not presented a credential. Anyone without a visible badge must be challenged politely or reported to [the site security lead].
- Entrances to zone 4 must use turnstiles, interlocks or door-held alarms that alert when more than one person passes on a single credential, where feasible. See the Tailgating and Piggybacking Guide.
4.6 CCTV, alarms and monitoring
- CCTV must be used only for the purposes recorded in [the CCTV data protection impact assessment], with signage at entrances and cameras positioned to avoid private areas.
- Footage must be retained for no longer than [30 days] unless required for an investigation, and access to it must be limited to [named roles] and logged.
- Intruder alarms, door-forced and door-held alarms for zones 3 to 5 must be monitored and responded to within [15 minutes] during [hours].
- Physical access events for zones 4 and 5 should be forwarded to [the SIEM] so they can be correlated with logical access, for example a remote login by a person whose badge shows them on site.
4.7 Environmental protection
| Threat | Requirement for zones 4 and 5 | Test or inspection |
|---|---|---|
| Power loss | Uninterruptible power supply sized for [15 minutes] at full load and a generator with fuel for [48 hours]; emergency shutoff protected from accidental activation | UPS and generator load test [quarterly] |
| Fire | Detection and suppression suitable for equipment rooms; fire-rated walls and doors | Per [local fire regulations], at least [annually] |
| Water | No water pipes above equipment where avoidable; leak detection under raised floors; master shutoff valves known and accessible | Leak sensor test [semi-annually] |
| Temperature and humidity | Monitoring with alerts outside [defined ranges]; redundant cooling | Continuous monitoring; alerts tested [quarterly] |
| Cabling | Power and data cabling protected from interception and damage; comms cabinets locked | Inspection [annually] |
For data centre design detail, see the Data Centre Security Guide.
4.8 Equipment and media
- Deliveries must be received in zone 1 or a dedicated delivery area and inspected before being moved into secure areas. Equipment leaving zones 3 to 5 must be authorised and logged.
- Equipment and storage media must be sanitised or destroyed before disposal, reuse or return to a vendor, with a certificate of destruction recorded. See the Media Sanitisation Guide.
- Laptops must be locked away or kept with the user outside working hours. Confidential papers must be locked away when desks are unattended, and screens must lock after [5 minutes] of inactivity.
- Printers in zone 2 should use pull printing so confidential output is not left in trays.
4.9 Physical security systems as IT systems
Access control, CCTV, alarm and building management systems are networked systems with their own servers, controllers, administrator accounts, service accounts and integrations. A compromise of them can open doors or blind cameras.
- Physical security systems must be on segmented networks, patched under [the vulnerability management policy], and included in the asset inventory.
- Administrator accounts must be individual, use MFA where supported, and be reviewed [quarterly]. Default credentials must be changed before go-live.
- Service accounts and API credentials that connect the access control system to HR, the directory or visitor management must have named owners, least privilege and scheduled rotation. See the IP Camera and CCTV Security Guide.
5. Exceptions
- Sites that cannot meet a requirement (for example a listed building, or a small shared office) must record the gap, compensating controls and a review date in [the exception register].
- Exceptions for zones 4 and 5 are approved by [CISO]; others by [Head of Facilities]. Exceptions expire after no more than [12 months].
6. Compliance and monitoring
- Each site must self-assess against this policy [annually]. Zone 4 and 5 sites must be independently inspected at least every [2 years].
- [Organisation] should run authorised physical penetration tests or tailgating tests at [selected sites annually]. See the Social Engineering and Physical Penetration Testing Guide.
- The [Head of Facilities] must report [quarterly] on:
- Leaver badges disabled within target.
- Zone 3 to 5 access reviews completed on time.
- Door-forced and door-held alarms, and response times.
- Tailgating test results and reported challenges.
- Environmental test results and failures.
- Breaches of this policy by staff may be handled under [the disciplinary procedure].
7. Review and approval
| Item | Value |
|---|---|
| Policy owners | [CISO] and [Head of Facilities] |
| Approved by | [Executive risk owner or committee] |
| Version and date | [1.0, date] |
| Review frequency | At least [annually], and after a physical security incident, a site move or a major refurbishment |
| Related documents | [Information security policy; access control policy; CCTV impact assessment; visitor procedure; media sanitisation standard; business continuity plan] |
Implementation guidance
Rollout
- Map zones first: walk each site with the facilities lead and draw the zone map. The walk usually finds comms cabinets in unlocked cupboards and network ports in public areas.
- Connect HR to access control: automate leaver badge disablement before tightening anything else. It closes the largest gap with the least disruption.
- Clean up access lists: run a first review of zones 3 to 5 with zone owners and remove unused access. Communicate the change so legitimate users are not locked out at night; keep the site security lead on call during the first week.
- Pilot new entry controls: trial interlocks or anti-passback at one zone 4 entrance and measure queueing and false alarms before rolling out.
- Harden the systems: bring access control and CCTV servers under IT patching and identity governance.
Failure patterns this policy is written to prevent
- Leavers who keep badges: manual deactivation is forgotten; section 4.2 automates it.
- Comms rooms treated as storage: unlocked rooms with network equipment; section 4.1 places them in zone 3.
- Cloneable badges: legacy proximity cards can be copied in seconds; section 4.3 moves to secure credentials.
- Physical systems outside IT governance: unpatched access control servers with default passwords; section 4.9 brings them in.
- Cyber and physical teams in silos: CISA's convergence guidance identifies isolated security functions as a risk; section 4.6 forwards physical events to the SIEM.
Framework mapping
| Framework | Reference | Policy sections |
|---|---|---|
| NIST CSF 2.0 | PR.AA-06 (physical access managed, monitored and enforced), PR.IR-02 (protection from environmental threats), DE.CM-02 (physical environment monitored) | 4.1 to 4.7 |
| NIST SP 800-53 Rev. 5 | PE-2, PE-3, PE-6, PE-8 (authorisation, access control, monitoring, visitor records); PE-9 to PE-15 (power, emergency, fire, environmental, water); PE-16 Delivery and Removal; PE-18 Location of System Components; MP-6 Media Sanitization | 4.1 to 4.8 |
| ISO/IEC 27001:2022 | Annex A 7.1 to 7.14 (physical controls) | Whole policy |
Sources
- NIST: SP 800-53 Rev. 5, Security and Privacy Controls
- NIST: Cybersecurity Framework 2.0
- CISA: Cybersecurity and Physical Security Convergence
Related NHI Mgmt Group resources: Physical Security Guide for Security Teams · Physical Access Control Systems Security Guide · Data Centre Security Guide · Tailgating and Piggybacking Guide · Media Sanitisation Guide