Join our Newsletter — 33% off our NHI Course
Home› Guides› DORA Article 28: General Principles for ICT Third-Party…
Guide Regulations & Frameworks

DORA Article 28: General Principles for ICT Third-Party Risk

PDF for newsletter subscribers · free to read online

← All guides
By NHI Mgmt Group, under the editorial direction of Lalit Choda Updated 27 November 2026 15 min read
On this page

Article 28 of DORA is the hinge of the whole third-party pillar: it keeps full responsibility with the financial entity, then sets the strategy, register, pre-contract checks, audit approach, termination rights and exit plans that every other third-party rule builds on. Regulation (EU) 2022/2554 has applied since 17 January 2025, and supervisors now test Article 28 through the register of information and through reviews of exit plans for critical or important functions. This guide walks through the article paragraph by paragraph, explains how proportionality changes the work for small and large entities, and connects each duty to the Level 2 texts that detail it: Delegated Regulation (EU) 2024/1773 on the contractual policy, Implementing Regulation (EU) 2024/2956 on register templates and Delegated Regulation (EU) 2025/532 on subcontracting. It is for risk, compliance, procurement and ICT risk teams. It goes deeper on Article 28 than the DORA Guide and does not repeat the contract clause detail in the DORA Article 30 Contract Provisions Guide.

Status checked on EUR-Lex in November 2026: DORA Article 28 in force and applicable; 2024/1773, 2024/2956 and 2025/532 adopted and in force. Level 2 texts and supervisory practice can change, so confirm against the official texts before relying on any point.

Key takeaways

  • Accountability never moves. Article 28(1)(a) says financial entities remain fully responsible for compliance with DORA and financial services law when they use ICT third-party services, whatever the contract says.
  • Ten paragraphs, one lifecycle. Strategy (28(2)), register (28(3)), pre-contract assessment (28(4)), security standards (28(5)), audits (28(6)), termination (28(7)) and exit (28(8)) form a sourcing lifecycle; 28(9) and 28(10) mandated the register templates and the policy RTS.
  • Proportionality is a principle, not an exemption. Article 28(1)(b) scales the effort to the nature, scale, complexity and importance of ICT dependencies; only microenterprises and Article 16(1) entities are carved out of the 28(2) strategy duty.
  • The register is the evidence. The 28(3) register, built on the 15 templates in 2024/2956, is what supervisors receive, and register data was the ESAs' starting point for the first designation of critical ICT third-party providers, announced on 18 November 2025.
  • Exit plans must be tested. Article 28(8) requires documented, tested and periodically reviewed exit plans for services supporting critical or important functions, and 2024/1773 Article 10 requires a documented exit plan for each such contract.

What Article 28 requires

Article 28 opens Chapter V, Section I of DORA (key principles for sound management of ICT third-party risk). The table summarises each paragraph from the official text on EUR-Lex. Wording is paraphrased; read the regulation itself for the binding text.

ParagraphDuty (paraphrased)Level 2 detailEvidence a supervisor will expect
28(1)(a)Manage ICT third-party risk as an integral part of the ICT risk management framework; the entity stays fully responsible for its obligationsArticle 6 ICT risk management framework; 2024/1773 Article 3Third-party risk inside the ICT risk framework, not a separate procurement process
28(1)(b)Apply proportionality, considering the nature, scale, complexity and importance of ICT dependencies and contract risks, including continuity impact at entity and group level2024/1773 Article 1; 2025/532 Article 1Documented criteria for how deeply each arrangement is assessed
28(2)Adopt and regularly review an ICT third-party risk strategy, including a policy on ICT services supporting critical or important functions; the management body regularly reviews the risks2024/1773 (policy content)Approved strategy and policy, minutes of management body review
28(3)Maintain a register of information on all ICT contractual arrangements at entity, sub-consolidated and consolidated level, distinguishing critical or important functions; report at least yearly on new arrangements; supply the register on request; inform the authority in a timely manner of planned arrangements for critical or important functions and when a function becomes critical or important2024/2956 (templates)Validated register submission, notification log
28(4)Before contracting: (a) assess whether the arrangement covers a critical or important function, (b) whether supervisory conditions are met, (c) identify and assess all relevant risks including ICT concentration risk under Article 29, (d) carry out due diligence on the provider, (e) identify and assess conflicts of interest2024/1773 Articles 5 to 7; Article 29Pre-contract risk assessment and due diligence file per arrangement
28(5)Contract only with providers that comply with appropriate information security standards; for critical or important functions, take due account of the most up-to-date and highest quality standards2024/1773 Article 6Security requirements and how the provider meets them
28(6)Set audit and inspection frequency and areas on a risk basis, in line with commonly accepted audit standards; for highly complex arrangements, verify auditors have the right skills2024/1773 Article 8Risk-based audit plan, auditor competence checks
28(7)Contracts can be terminated for (a) significant breach of law, regulation or contract, (b) circumstances found in monitoring that could alter performance, (c) evidenced weaknesses in the provider's ICT risk management, (d) arrangements that prevent effective supervisionArticle 30(2)(h); 2025/532 Article 6Termination clauses mapped to all four grounds
28(8)Exit strategies for services supporting critical or important functions, covering provider failure, deterioration of service, business disruption and 28(7) termination, without disruption to business, compliance or client service; exit plans documented, tested and periodically reviewed; alternatives and transition plans identified2024/1773 Article 10; Article 30(3)(f)Exit plan per critical contract, test records, named alternatives
28(9)ESAs to draft implementing technical standards for register templates (deadline 17 January 2024)Implementing Regulation (EU) 2024/2956Not an entity duty
28(10)ESAs to draft regulatory technical standards on the 28(2) policy for critical or important functions (deadline 17 January 2024)Delegated Regulation (EU) 2024/1773Not an entity duty

Article 29 sits directly after and expands 28(4)(c): when the arrangement supports a critical or important function, the entity considers whether it would depend on a provider that is not easily substitutable, or hold multiple arrangements with the same or closely connected providers. Where subcontracting is allowed, Article 29(2) asks the entity to weigh third-country subcontractors, insolvency law, urgent data recovery and long or complex chains. See the Third-Party Concentration Risk Guide.

Proportionality

Article 28(1)(b) is the dial for the rest of the article. Delegated Regulation 2024/1773 Article 1 lists the factors the policy should weigh, including the type of ICT service, the location of the provider and its parent, the location and nature of data, whether the provider is intra-group, whether it is authorised or supervised, concentration, how transferable the service is and the impact of disruption. Proportionality changes depth, not whether a duty applies.

Entity profileWhat appliesPractical scaling
Microenterprise or Article 16(1) entity (simplified ICT risk framework)Exempt from the 28(2) strategy duty; 28(1), 28(3) register and 28(4) to 28(8) still applyShort assessment template, register kept current, exit plans only for services supporting critical or important functions
Small or mid-sized entity with few critical providersFull Article 28; policy under 2024/1773One policy for all critical contracts, annual management body review, desk-based due diligence plus independent reports
Large group, many critical providers, intra-group service companiesFull Article 28 at entity, sub-consolidated and consolidated level; 2024/1773 Article 2 group consistencyParent sets the group policy, central register with entity views, onsite and pooled audits, tested exit plans for each critical cloud and core banking service

Decision guidance: classify the function first, then scale. A small payment institution whose core processing runs on one SaaS platform has a critical dependency and needs a credible, tested exit plan for it, even if the rest of its supplier base gets light-touch treatment. A large bank can still apply proportionality across thousands of low-impact contracts, as long as its criteria are written down and applied consistently. See the Third Party Risk for Small Organisations guide for lighter-weight techniques.

Pre-contract due diligence

Article 28(4) and 28(5) fix what must happen before signature, and 2024/1773 Articles 5 to 7 describe how. Run them in this order so the classification drives the depth of everything else:

  1. Define the business need (2024/1773 Article 5) and record the function the service supports.
  2. Classify the function as critical or important or not, using the methodology the policy must contain (2024/1773 Article 3). Article 3(22) of DORA defines a critical or important function.
  3. Check supervisory conditions (28(4)(b)), for example sector rules or national conditions on outsourcing and data location.
  4. Run the ex-ante risk assessment covering operational, legal, ICT, reputational, data protection and confidentiality, data availability, data and provider location and ICT concentration risk (2024/1773 Article 5; DORA Article 29).
  5. Carry out due diligence on the provider (2024/1773 Article 6): reputation, resources, information security, organisational structure, risk management, authorisations, use of subcontractors, third-country exposure, willingness to accept audits including onsite audits, and ethical and social conduct.
  6. Set the assurance level and its sources: own audits, independent audit reports, internal audit reports, certifications. 2024/1773 Article 8 warns against relying only on certifications or third-party reports over time.
  7. Assess conflicts of interest (28(4)(e); 2024/1773 Article 7), with intra-group terms set objectively.
  8. Record the decision and create the register entry before the service goes live, then notify the authority in a timely manner if it supports a critical or important function (28(3)).

Where the provider may subcontract parts of a critical service, add the 2025/532 Article 3 pre-assessment of the chain. See the DORA Subcontracting RTS Guide and the Fourth-Party and Nth-Party Risk Guide.

Where identity fits: provider access is delivered through service accounts, API keys, OAuth grants and federated admin accounts. The 28(5) security assessment should ask how the provider's identities reach your environment, who approves them and how they are revoked at exit. See the Third-Party Risk Management Guide.

Register of information

Article 28(3) creates a standing register of all ICT contractual arrangements, not only those for critical functions, and Implementing Regulation (EU) 2024/2956 (adopted 29 November 2024) fixes its form. Its Article 3 requires the register at entity level and at sub-consolidated and consolidated level, covering all ICT services from direct providers and, for services supporting critical or important functions, the subcontractors that underpin them. Data must meet six quality principles: accuracy, completeness, consistency, integrity, uniformity and validity. Legal-person providers are identified by a valid LEI or EUID.

Template groupTemplatesArticle 28 link
Entity and scopeB_01.01 to B_01.03 (entity maintaining the register, consolidation scope, branches)28(3) levels of application
ContractsB_02.01 to B_02.03 (general, specific, intra-group arrangements)28(3) all arrangements; 28(7) termination data
SignatoriesB_03.01 to B_03.0328(1)(a) responsibility at entity level
Users of servicesB_04.0128(1)(b) group continuity impact
Providers and supply chainB_05.01, B_05.0228(4)(c) concentration; Article 29(2) chains
FunctionsB_06.0128(3) distinction of critical or important functions
AssessmentsB_07.0128(4) assessment results; 28(8) substitutability and exit
DefinitionsB_99.01Entity-specific values used in the register

According to the ESAs' 18 November 2025 announcement, the ESAs first collected data from the registers of information maintained by financial entities, then carried out the criticality assessment that led to the first list of designated critical ICT third-party providers. See the DORA ICT Third-Party Risk and Register of Information Guide for templates, keys and the annual cycle, and the DORA Critical ICT Third-Party Provider Oversight Guide for what designation means.

Exit strategies

Article 28(8) is the paragraph most often found weak in practice, because an exit plan is easy to write and hard to prove. It applies to ICT services supporting critical or important functions and must cover provider failure, deterioration of service quality, business disruption and termination under 28(7). Exits must happen without disrupting business, limiting regulatory compliance or harming continuity and quality of service to clients. 2024/1773 Article 10 adds that each such contract needs a documented exit plan that is realistic, feasible, based on plausible scenarios, reviewed and tested periodically, with a timetable compatible with the contract's exit terms.

Exit plan elementSourceHow to test it
Trigger scenarios (failure, degradation, unexpected termination)28(8); 2024/1773 Article 10Tabletop each scenario with business owner and provider manager
Alternative solutions (other provider or in-house)28(8)Market check or proof of concept recorded with date
Transition plan for services and data28(8); Article 30(3)(f) transition periodExport and restore a representative data set in a usable format
Contingency measures during exit28(8)Link to business continuity plan; run a failover or manual workaround drill
Timeline aligned to contract terms2024/1773 Article 10Compare plan duration with notice and transition periods in the contract
Access and credential revocation28(8) business continuity (practitioner addition)Inventory provider accounts, keys and tokens, rehearse revocation

For cloud services, see the Cloud Exit Plan Template and the Cloud Concentration Risk and Exit Strategy Guide.

InstrumentSubjectStatus (EUR-Lex)Article 28 paragraph
Delegated Regulation (EU) 2024/1773Detailed content of the policy on contractual arrangements for ICT services supporting critical or important functionsAdopted 13 March 2024, published 25 June 2024, in force on the twentieth day after publication28(2), 28(4) to 28(8); mandated by 28(10)
Implementing Regulation (EU) 2024/2956Standard templates for the register of informationAdopted 29 November 2024, published 2 December 202428(3); mandated by 28(9)
Delegated Regulation (EU) 2025/532Elements to determine and assess when subcontracting ICT services supporting critical or important functionsAdopted 24 March 2025, published 2 July 202528(4), 28(7), 28(8) via Article 30(5)
DORA Article 29 and Article 30Concentration risk and key contractual provisionsPart of DORA, applicable since 17 January 202528(4)(c), 28(7), 28(8)

Monitoring, metrics and framework mapping

2024/1773 Article 9 requires key indicators to monitor provider performance, including confidentiality, availability, integrity and authenticity of data, with remedies for missed service levels. Useful internal measures for Article 28 itself:

  • Register completeness: share of active ICT contracts with a register entry before go-live (target 100%), and validation errors per submission.
  • Classification coverage: share of contracts with a dated critical or important function assessment.
  • Due diligence currency: critical providers with due diligence or assurance refreshed within the policy period.
  • Exit readiness: critical contracts with an exit plan tested in the last cycle, and the median gap between planned exit duration and contractual transition period.
  • Termination clause coverage: critical contracts whose clauses cover all four 28(7) grounds.
Article 28 areaNIST CSF 2.0NIST SP 800-53 Rev 5ISO/IEC 27001:2022 Annex A
Strategy and policy (28(2))GV.SC-05SR-25.19
Register (28(3))GV.SC-04SA-95.19, 5.22
Pre-contract assessment (28(4), 28(5))GV.SC-06, GV.SC-07SR-5, SR-65.20, 5.21
Audit and monitoring (28(6))GV.SC-07SR-65.22
Termination and exit (28(7), 28(8))GV.SC-08, GV.SC-10CP-25.23

The mapping shows related controls; meeting them does not by itself show DORA compliance. See DORA vs ISO 27001.

Common failure patterns

  • Procurement list as register: supplier spreadsheets that miss intra-group services, subcontractors behind critical services or valid LEIs fail 2024/2956 validation.
  • Classification after signature: the critical or important assessment is done for the register, months after the contract, so 28(4) due diligence was never scaled to it.
  • Certificate-only assurance: relying on one certification year after year, which 2024/1773 Article 8 cautions against.
  • Exit plans never exercised: plans that name no alternative and have never moved a data set fail 28(8). The July 2024 global outage showed how one provider can stop many firms at once; see the Third-Party Concentration Risk Guide.
  • Missed notifications: no process to tell the authority when a new critical arrangement is planned or a function becomes critical (28(3)).
  • Strategy without review: the 28(2) strategy approved once and never put back to the management body.

Practitioner checklist

  • Map each Article 28 paragraph to a named owner, procedure and evidence location.
  • Have the management body approve the ICT third-party risk strategy and the 2024/1773 policy, and review the policy at least annually.
  • Write down the critical or important function methodology and apply it before every new contract.
  • Run the 28(4) steps, including Article 29 concentration checks, before signature and keep the file.
  • Create the register entry before go-live and reconcile the register with contract and accounts payable data each quarter.
  • Build a notification step for planned critical arrangements and for functions that become critical.
  • Check every critical contract for the four 28(7) termination grounds.
  • Test at least one exit scenario per critical service each cycle, including data export and revocation of provider access.
  • Track the five metrics above and report them to the management body.

Standards and references

Related NHI Mgmt Group resources: DORA Guide · DORA ICT Third-Party Risk and Register of Information Guide · DORA Article 30 Contract Provisions Guide · Third-Party Risk Management Guide. This guide summarises Article 28 of Regulation (EU) 2022/2554 and related technical standards and is not legal advice.

PDF for subscribers

Take this guide with you

Every section, table and checklist in one PDF, with links to the sources and related guides. Subscribe to our weekly NHI & AI Identity Journal and we’ll email you a download link.

Free weekly newsletter

Subscribe to the NHI & AI Identity Journal

The latest on NHI and Agentic AI security – articles, research, breaches, news and events every week.

Bonus 33% off our NHI Course when you subscribe.

PDF Downloads for Newsletter Subscribers

Get the guide

Enter your details and we’ll email you a download link.

The full guide is free to read online. The PDF is a thank you for subscribing.

Fill in all fields marked * and tick both boxes to continue.