Join our Newsletter — 33% off our NHI Course
Home› Guides› Legacy Medical Devices Security Guide: IMDRF N70, End…
Guide OT & IoT Security

Legacy Medical Devices Security Guide: IMDRF N70, End of Support and Compensating Controls

PDF for newsletter subscribers · free to read online

← All guides
By NHI Mgmt Group, under the editorial direction of Lalit Choda Updated 27 November 2026 12 min read
On this page

Hospitals keep infusion pumps, imaging systems and patient monitors in clinical use for years after the manufacturer stops patching them, and those devices cannot simply be switched off. The International Medical Device Regulators Forum (IMDRF) document N70, Principles and Practices for the Cybersecurity of Legacy Medical Devices, gives manufacturers and healthcare providers a shared lifecycle model and a clear point where cyber security responsibility moves to the hospital. This guide turns N70 into practical steps: how to recognise a legacy device, what to demand from manufacturers before end of support, which compensating controls work without putting patients at risk, and how to plan replacement. It is written for clinical engineering, biomedical and security teams in hospitals and health systems.

Key takeaways

  • Legacy is a security state, not an age: N70 and the FDA-commissioned MITRE paper define a legacy device as one that cannot be reasonably protected against current cyber security threats, and some devices bought today already qualify.
  • Four stages, two milestones: N70 tracks devices through Development, Support, Limited Support and End of Support, with End of Life (EOL) and End of Support (EOS) as the triggers.
  • Responsibility shifts at EOS: from EOS, cyber security responsibility moves primarily to the healthcare provider, so the hospital must know what risks it will inherit before that date.
  • Compensating controls buy time, not safety: isolation, allow-listed flows, removal of remote access and monitoring reduce exposure; N70 warns manufacturers not to rely solely on firewalls or segmentation.
  • Replacement starts at procurement: ask for EOL and EOS dates, an SBOM and an MDS2 before purchase, and budget for replacement years ahead.

What makes a device legacy

N70 (reference IMDRF/CYBER WG/N70FINAL:2023) builds on the IMDRF total product lifecycle (TPLC) approach. A device is legacy when it can no longer be reasonably protected against current threats. That can happen before the manufacturer declares EOS: an embedded operating system or third-party component can lose supplier support while the device itself is still on sale. The MITRE paper prepared for the FDA in 2023 makes the same point and adds that devices often stay in use well past the declared end of support, creating a gap between how long hospitals use equipment and how long manufacturers support it.

Legacy signalWhy it mattersWhere to find it
Unsupported operating system or runtime in the device or its workstationNo security updates for known vulnerabilitiesSBOM, MDS2 form, manufacturer customer notices
Manufacturer EOL notice issuedDevice enters Limited Support; patches may slowManufacturer portal, procurement records
EOS date reached or announcedAll service support ends; hospital inherits the riskCustomer notice, service contract
Hard-coded or shared credentials that cannot be changedCannot be fixed by configurationMDS2, manufacturer security documentation
Unmitigated vulnerability with no vendor fixDevice cannot be reasonably protectedManufacturer advisories, CISA ICS medical advisories

Your device inventory is the foundation. See the Hospital Medical Device Inventory and IoMT Visibility Guide for discovery and record-keeping; this guide assumes you already know what is on the network.

IMDRF N70 lifecycle framework

StageN70 descriptionHospital actions
1. DevelopmentPre-market: security built in, risk assessment, threat modelling, testing, customer security documentationEvaluate security documentation during procurement; record planned EOL and EOS dates
2. SupportOn the market; major software, firmware and programmable hardware components supported by their suppliers; full cyber security support including patchesApply validated updates, monitor advisories, keep SBOM and configuration current
3. Limited SupportEOL reached and device no longer marketed, or it contains unsupported components whose risks have been mitigated so it can still be reasonably protected; a transitional periodStart transition planning, budget for replacement, tighten compensating controls
4. End of SupportEOS reached, or unsupported components whose risks are not mitigated, so the device cannot be reasonably protected against current threatsFormal risk acceptance or decommissioning; maintain controls and monitoring
  • EOL milestone: the manufacturer stops selling the product beyond its defined useful life and completes a formal EOL process including user notification. This starts Limited Support.
  • EOS milestone: the manufacturer ends all service support. This starts the End of Support stage and moves cyber security responsibility primarily to the healthcare provider.
  • No fixed durations: N70 does not set a length for Support or Limited Support. Plan using each manufacturer's published dates.

Shared responsibility with manufacturers

N70 describes current practice as giving lifecycle milestone information at least two years in advance, and starting the transfer of cyber security responsibility roughly two to three years before EOS. Before EOS, the manufacturer should tell users which risks they will inherit, with mitigations and upgrade options. Use these points as the minimum you expect, and write them into contracts.

InformationWhen to askUse in the hospital
EOL and EOS dates, upgrade strategyProcurement and installationCapital planning, replacement forecast
MDS2 form and SBOMProcurement, then at each major updateVulnerability matching, legacy signal detection
Required network ports, IP addresses, firewall rules, logging capabilityBefore installationAllow-list design and monitoring baselines
Vulnerability notification method and patch processContractAdvisory routing to clinical engineering and security
Privileged and remote service access arrangementsContractVendor access control and session monitoring
Support status of third-party components, with risk assessmentsOngoing, especially in Limited SupportEarly warning before formal EOS
Inherited risks, post-EOS support options, decommissioning informationBefore EOSRisk acceptance decision and data sanitisation

The Health Sector Coordinating Council's Health Industry Cybersecurity: Managing Legacy Technology Security (HIC-MaLTS, 2023) adds a responsibility transfer framework: before continuing to use unsupported technology, assess safety and effectiveness, clinical impact and technical risk management. For reading MDS2 forms and SBOMs in detail see the MDS2 and Medical Device SBOM Guide for Hospitals. For manufacturer obligations on new devices see the FDA Medical Device Cybersecurity Guide and the EU MDR Cybersecurity and MDCG 2019-16 Guide.

Compensating controls

N70 Table 1 lists the controls a provider can apply when patching is not possible. Choose them with clinical engineering and, where the change could affect device function, the manufacturer. Never run active vulnerability scans against devices in clinical use without the manufacturer's confirmation that it is safe.

Control (N70)Practical implementationPatient safety check
Isolate or place on a segregated VLANDedicated clinical segment per device family; deny by default between segmentsConfirm clinical data flows (PACS, EHR interfaces, alarms) still reach their destinations
Firewall with only necessary ports openAllow-list from the manufacturer's port and IP list, for example DICOM to the PACS and HL7 to the interface engineTest in a maintenance window with the clinical owner present
Remove remote accessDisable always-on vendor VPNs; use brokered, time-bound, recorded sessions approved per jobAgree an emergency support route so a device fault is not left unresolved
Monitor with IDS, IPS or SIEMPassive network monitoring tuned to medical protocols; alert on new destinations or new protocolsUse passive monitoring only; inline IPS blocking needs manufacturer agreement
Restrict physical access, tamper-evident sealsLock USB and service ports; seal enclosures; locate workstations away from public areasClinicians retain access to controls they need
Restrict removable mediaBlock or control USB; scan media at a kiosk before service usePlan how software loads and log exports will be done
Anti-malware after consulting the manufacturerOnly manufacturer-validated products and settings, often application allow-listingUnvalidated agents can affect real-time performance
Backup and restore proceduresConfiguration and image backups; tested restore; spare units for critical devicesDowntime procedures rehearsed with the ward

Network design detail is in the Hospital Clinical Network Segmentation Guide. The aim is to stop the two routes attackers use most against unpatched equipment: inbound exploitation of exposed services (ATT&CK for ICS T0866 Exploitation of Remote Services) and lateral movement from a compromised workstation. ATT&CK mitigation M1030 Network Segmentation describes the same control.

Where identity fits

Legacy devices often carry machine credentials that cannot be rotated: hard-coded service passwords, shared local accounts on modality workstations, and vendor support accounts. Treat each as a non-human identity with an owner. Where the credential cannot be changed, limit where it can be used from (source restrictions at the firewall), broker vendor access through a privileged access tool with session recording, and alert on any use outside an approved service window. See the Healthcare Identity Security Guide.

Detection and measurement

  • Log: firewall allow and deny events for clinical segments, remote access session start and end, new MAC or IP addresses appearing on device segments, and any traffic to the internet from device VLANs.
  • Alert on: a device talking to a destination outside its manufacturer allow-list, SMB or RDP from device workstations to general IT, and vendor account use outside an approved window.
MetricWhat good looks like
Share of connected devices with a recorded N70 stage and EOS dateClose to 100%, reviewed quarterly
End of Support devices with a signed risk acceptance and named owner100%
End of Support devices on an isolated segment with allow-listed flows100%, verified by flow data not diagrams
Devices with always-on vendor remote accessFalling to zero
Devices due to reach EOS within 3 years with funded replacementRising year on year

Planning replacement

N70 lists questions to answer before accepting risk past EOS: maintenance cost against upgrade cost, the ability to keep the device secure, patient risk if it is compromised, and whether it can run offline. A phased approach:

  1. Classify: add N70 stage, EOL and EOS dates and SBOM status to every inventory record; flag devices already in End of Support.
  2. Prioritise: rank End of Support devices by clinical criticality, network exposure and known unmitigated vulnerabilities.
  3. Contain: apply the compensating controls above to the top tier first, testing each change in a maintenance window with a rollback plan (keep the previous firewall rule set ready to restore).
  4. Decide: for each device choose replace, upgrade, take offline (standalone use) or formally accept, signed by the clinical owner and the accountable executive.
  5. Fund: feed EOS dates into the capital plan at least three years ahead, matching the two to three year transfer window N70 describes.
  6. Buy better: in every tender ask for EOL and EOS dates, upgrade strategy, SBOM, MDS2, ports, logging, backup and restore, and vulnerability notification. The IoT Device Procurement Security Checklist covers the general questions.
  7. Decommission safely: use manufacturer decommissioning information to sanitise patient data and remove credentials, network rules and accounts tied to the device.

Smaller hospitals with few staff should focus on steps 1, 3 and 6 and use regional partnerships or Health-ISAC resources; the MITRE paper notes that rural and safety-net hospitals face the greatest difficulty and recommends mutual aid.

Common failure patterns

  • Waiting for the EOS letter: devices become legacy when an embedded component loses support, often years before formal EOS.
  • Segmentation on paper: a VLAN exists but flows are any-to-any, so a compromised workstation reaches every device. Verify with flow data.
  • Permanent vendor tunnels: always-on remote support connections left in place after the device enters End of Support.
  • Unvalidated security agents: installing anti-malware or scanning devices without manufacturer confirmation, causing performance problems in clinical use.
  • Risk accepted by nobody: End of Support devices kept in service without a documented decision, owner or review date.
  • No replacement budget: EOS dates never reach the capital plan, so every device becomes an emergency.

Framework mapping

FrameworkReferenceRelevance
NIST SP 800-53 Rev. 5SA-22 Unsupported System Components; CM-8 System Component InventoryReplace or justify unsupported components; inventory with lifecycle data
NIST SP 800-53 Rev. 5SC-7 Boundary Protection; SI-4 System Monitoring; MA-4 Nonlocal Maintenance; SR-12 Component DisposalIsolation, monitoring, vendor remote access, decommissioning
NIST CSF 2.0ID.AM-01; ID.AM-08; PR.PS-02; PR.IR-01; DE.CM-01Inventory, lifecycle management, replacement, protection and monitoring
ISO/IEC 27001:2022 Annex A8.20 Networks security; 8.22 Segregation of networks; 5.9 Inventory of information and other associated assetsNetwork controls and asset records
MITRE ATT&CKT0866 Exploitation of Remote Services (ICS); M1030 Network SegmentationThreat addressed and the mitigating control

Practitioner checklist

  • Record the N70 stage, EOL date, EOS date and SBOM status for every connected medical device.
  • Ask manufacturers for lifecycle dates at least two years ahead and for the list of inherited risks before EOS.
  • Write EOL and EOS dates, SBOM, MDS2, ports and vulnerability notification into every new contract.
  • Place End of Support devices on isolated segments with manufacturer-based allow-lists, verified by flow data.
  • Replace always-on vendor access with brokered, time-bound, recorded sessions.
  • Treat hard-coded and shared device credentials as owned non-human identities with source restrictions.
  • Get manufacturer confirmation before installing agents or scanning devices in clinical use.
  • Sign a risk acceptance with a review date for each End of Support device kept in service.
  • Feed EOS dates into the capital plan at least three years ahead.

Standards and references

Related NHI Mgmt Group resources: Medical Device Security Guide · Hospital Medical Device Inventory and IoMT Visibility Guide · Hospital Clinical Network Segmentation Guide · Hospital Cyber Security Programme Guide

PDF for subscribers

Take this guide with you

Every section, table and checklist in one PDF, with links to the sources and related guides. Subscribe to our weekly NHI & AI Identity Journal and we’ll email you a download link.

Free weekly newsletter

Subscribe to the NHI & AI Identity Journal

The latest on NHI and Agentic AI security – articles, research, breaches, news and events every week.

Bonus 33% off our NHI Course when you subscribe.

PDF Downloads for Newsletter Subscribers

Get the guide

Enter your details and we’ll email you a download link.

The full guide is free to read online. The PDF is a thank you for subscribing.

Fill in all fields marked * and tick both boxes to continue.