Join our Newsletter — 33% off our NHI Course
Home› Guides› Post-Quantum Cryptography Deadlines Tracker: Every Official PQC Date…
Guide Data Security

Post-Quantum Cryptography Deadlines Tracker: Every Official PQC Date in One Place

PDF for newsletter subscribers · free to read online

← All guides
By NHI Mgmt Group, edited by Lalit Choda Updated 28 October 2026 15 min read
On this page

Post-quantum cryptography deadlines are now set by at least five official bodies, and they do not line up neatly, so most migration plans quote the wrong date for the wrong audience. This tracker collects the dates that governments and standards bodies have actually published for moving from RSA and elliptic curve cryptography to post-quantum algorithms, with the source for each and its current status. It covers the United States (NIST, NSA and the White House), the United Kingdom (NCSC), the European Union and Canada. It is written for CISOs, cryptography and PKI owners, and the people who must turn deadlines into budgets and supplier requirements. It is a living page reviewed monthly; the detail of the NIST timeline is in the NIST IR 8547 PQC Transition Timeline Guide, which we do not repeat here.

Status as of 28 October 2026: every date below was checked against the official source on 28 October 2026. NIST IR 8547 and SP 800-131A Rev. 3 were still Initial Public Drafts. Items marked Draft can still change.

Key takeaways

  • 2035 is the common end point. The US (NSM-10), NSA for national security systems, the UK NCSC and Canada all point to 2035 for completing migration, and NIST's draft disallows quantum-vulnerable public key algorithms after 2035.
  • The real pressure comes earlier. NSA requires new national security system acquisitions to be CNSA 2.0 compliant from 1 January 2027, the EU wants critical infrastructure moved by the end of 2030, and US agencies must support TLS 1.3 or a successor by 2 January 2030.
  • Discovery and planning deadlines are already here. The EU asks Member States to start transitioning by the end of 2026, Canada required departmental plans from April 2026, and the NCSC expects full discovery and an initial plan by 2028.
  • Two key NIST documents are still drafts. IR 8547 (2030 deprecation, 2035 disallowance) and SP 800-131A Rev. 3 were Initial Public Drafts when checked, so treat their dates as stated intent and watch for final versions.
  • Machine identities carry most of the work. Certificates, TLS endpoints, code signing keys, SSH keys and VPN tunnels are where the dates bite, which makes PQC a non-human identity programme as much as a cryptography one.

All deadlines at a glance

Dates are listed in time order. "Applies to" is the legal or policy scope; organisations outside that scope often adopt the same dates through regulators, auditors or supplier contracts.

DateBody and documentWhat is dueApplies toStatus
Annually since 2023White House, NSM-10 (4 May 2022)Inventory of IT systems still vulnerable to a quantum computer, first due within one year of the memorandum, focused on High Value Assets and High Impact SystemsUS federal civilian agenciesIn force
1 December 2025White House, Executive Order 14306 (6 June 2025)CISA, with NSA, to publish a list of product categories where PQC-capable products are widely available; NSA and OMB to issue TLS 1.3 requirementsUS federal governmentDue date passed; publication of the CISA list not confirmed from cisa.gov when checked
April 2026, then annuallyCanadian Centre for Cyber Security, ITSM.40.001 (June 2025)Initial departmental PQC migration plan; annual progress reports from April 2026Government of Canada departmentsIn force
End of 2026EU coordinated implementation roadmap (23 June 2025)All Member States should start transitioning to PQCEU Member States (recommendation)Published roadmap
1 January 2027NSA, CNSA 2.0 under CNSSP 15New national security system acquisitions must be CNSA 2.0 compliant unless otherwise notedUS national security systems and their suppliersIn force
2028UK NCSC, PQC migration timelines (20 March 2025)Define migration goals, carry out a full discovery exercise, build an initial migration planAll UK organisations, aimed at large organisations, CNI and bespoke ITGuidance
2 January 2030Executive Order 14306Agencies support TLS 1.3 or a successor as soon as practicable and no later than this dateUS federal agenciesIn force
After 2030NIST IR 8547 (Initial Public Draft, 12 November 2024)112-bit quantum-vulnerable signatures and key establishment (RSA-2048 class) deprecatedUS federal systems, and anyone following NISTDraft
End of 2030EU coordinated implementation roadmapCritical infrastructure protection moved to PQC as soon as possible and no later than the end of 2030EU Member States (recommendation)Published roadmap
31 December 2030NSA, CNSA 2.0Equipment and services that cannot support CNSA 2.0 phased out; fielded equipment transition expected completeUS national security systemsIn force
2031UK NCSCEarly, highest-priority PQC migration complete; refined roadmap for full migrationUK organisationsGuidance
31 December 2031NSA, CNSA 2.0CNSA 2.0 algorithms mandated for use unless otherwise notedUS national security systemsIn force
End of 2031Canada ITSM.40.001PQC migration of high priority systems completeGovernment of CanadaIn force
2035NSM-10; NSA CNSA 2.0Mitigate as much quantum risk as feasible; all national security systems quantum resistantUS federal government and NSSIn force
After 2035NIST IR 8547 (draft)All quantum-vulnerable public key algorithms disallowed at any strengthUS federal systemsDraft
2035UK NCSCMigration of all systems, services and products completeUK organisationsGuidance
End of 2035Canada ITSM.40.001PQC migration of remaining systems completeGovernment of CanadaIn force

United States: NIST, NSA and the White House

Policy layer

  • NSM-10 (4 May 2022): sets the federal goal of "mitigating as much of the quantum risk as is feasible by 2035" and requires federal civilian agencies to deliver annual inventories of quantum-vulnerable systems to CISA and the National Cyber Director.
  • Executive Order 14306 (6 June 2025): replaced the PQC section of EO 14144. It asked CISA, with NSA, to publish by 1 December 2025 a regularly updated list of product categories in which PQC-capable products are widely available, and asked NSA (for national security systems) and OMB (for everything else) to issue requirements by the same date for agencies to support TLS 1.3 or a successor no later than 2 January 2030. We could not confirm the CISA list on cisa.gov when we checked; if you rely on it for procurement, check the CISA site directly.

Standards layer (NIST)

  • Algorithms: the post-quantum standards FIPS 203 (ML-KEM), FIPS 204 (ML-DSA) and FIPS 205 (SLH-DSA) were published as final in August 2024. See the ML-KEM Guide and the ML-DSA and SLH-DSA Post-Quantum Signatures Guide.
  • NIST IR 8547: Initial Public Draft of 12 November 2024; comments closed on 10 January 2025 and the comments received were posted on 21 January 2025. The CSRC page showed no final or revised version on 28 October 2026. In the draft, 112-bit quantum-vulnerable algorithms are deprecated after 2030 and all quantum-vulnerable public key algorithms are disallowed after 2035.
  • SP 800-131A Rev. 3: Initial Public Draft of 21 October 2024, comments closed 4 December 2024. This is the document that will give algorithm transitions force for federal systems, so its final text matters more than IR 8547 for compliance teams.

National security systems (NSA CNSA 2.0)

NSA announced the Commercial National Security Algorithm Suite 2.0 on 7 September 2022. Its FAQ sets the CNSSP 15 dates in the table above and names the algorithms below. CNSA 2.0 is stricter than NIST: it picks the highest parameter sets only.

FunctionCNSA 2.0 algorithmNote for planners
Symmetric encryptionAES-256AES-128 is not CNSA 2.0 compliant even though NIST accepts it
Key establishmentML-KEM-1024Larger keys and ciphertexts than ML-KEM-768, which many commercial hybrids use
Digital signaturesML-DSA-87Check certificate size limits in devices and protocols
HashingSHA-384 or SHA-512SHA3-384 and SHA3-512 only for internal hardware integrity such as secure boot
Firmware and software signingLMS or XMSS (stateful hash-based)NSA expected quantum-resistant roots of trust for some long-lived signatures from 2025

NSA also published per-category dates (software signing, browsers and cloud services, networking equipment, operating systems and others) in its CNSA 2.0 advisory. We could not retrieve that document from the official site when checking, so those category dates are not listed here; read them in the NSA advisory before using them.

United Kingdom: NCSC

The NCSC published its PQC migration timelines on 20 March 2025. They apply to all organisations, with large organisations, critical national infrastructure operators and companies with bespoke IT as the main audience. SMEs that use custom or specialised software are asked to follow the same timetable.

  • By 2028: define migration goals, carry out a full discovery exercise and build an initial plan, including supplier dependencies, investment needs and long-lived hardware roots of trust. Tell suppliers what you need.
  • By 2031: complete early, highest-priority migration of the most critical assets and refine the plan into a full roadmap.
  • By 2035: complete migration of all systems, services and products. The NCSC accepts that a small set of rarely used technologies may be harder to move by then.

The NCSC dates are guidance, not law, but UK regulators and auditors increasingly use them as the reference. The 2028 milestone is effectively an inventory deadline; see the Cryptographic Inventory and CBOM Guide.

European Union

EU Member States, supported by the European Commission, published the coordinated implementation roadmap for the transition to post-quantum cryptography on 23 June 2025. It is the first deliverable of the PQC work stream set up with the NIS Cooperation Group following the Commission's earlier recommendation.

  • End of 2026: all Member States should start transitioning to PQC.
  • End of 2030: critical infrastructure protection should move to PQC as soon as possible and no later than the end of 2030.
  • Later milestones: the roadmap document itself contains further detail. Its PDF could not be read when we checked, so no later EU date is listed here; read the roadmap and its FAQ directly before quoting one.

The roadmap is addressed to Member States. For operators it arrives through national authorities and sector rules such as NIS2 implementation. Operators of essential and important entities should expect national authorities to ask for inventories and plans in line with the 2026 and 2030 dates.

Canada

The Canadian Centre for Cyber Security published the roadmap for migrating Government of Canada systems (ITSM.40.001) in June 2025, effective 23 June 2025. Departments had to produce an initial PQC migration plan by April 2026 and report progress annually from then. High priority systems must complete migration by the end of 2031 and remaining systems by the end of 2035. The structure matches the NCSC closely, which makes Canada a useful second reference for organisations operating in both markets.

Turning the dates into a plan

Most organisations are bound by none of these documents directly and by all of them indirectly. Use the earliest date that applies to any customer, regulator or supplier relationship you have, then plan backwards.

If you areEarliest binding pressureWhat to have ready
Supplier to US national security systems1 January 2027 (CNSA 2.0 for new acquisitions)Product roadmap with ML-KEM-1024, ML-DSA-87 and LMS/XMSS firmware signing; FIPS 140-3 validation plans
Supplier to US federal civilian agencies2 January 2030 (TLS 1.3); IR 8547 2030 deprecation once finalTLS 1.3 everywhere, hybrid key exchange support, crypto inventory evidence for customers
EU critical infrastructure operatorEnd of 2026 start, end of 2030 completion for critical systemsInventory, risk ranking and funded migration programme by 2026
UK organisation2028 discovery and planFull cryptographic inventory, supplier questionnaire, initial plan
Global SaaS or financial firmWhichever customer contract adopts the earliest dateCrypto-agile architecture and a published PQC roadmap

Phased approach

  1. Now to 2026: discover. Build the cryptographic inventory, including certificates, keys, protocols, libraries and hardware security modules. Rank by data lifetime: anything that must stay confidential past 2035 is exposed to harvest now, decrypt later collection today. See the Harvest Now Decrypt Later Risk Assessment Template.
  2. 2026 to 2027: prepare and pilot. Move to TLS 1.3, enable hybrid key exchange where your stack supports it, test certificate and handshake size impacts in a pilot ring, and put PQC requirements into procurement. See the Hybrid Post-Quantum TLS Key Exchange Guide.
  3. 2028 to 2030: migrate key establishment first. NIST's draft prioritises key establishment in interactive protocols such as TLS and IKE because of stored traffic. Keep classical fallback configurable so you can roll back a failing endpoint without disabling PQC elsewhere.
  4. 2030 to 2035: migrate signatures and long-lived trust. PKI hierarchies, code signing and device roots of trust take longest because they depend on hardware and partners. See the Post-Quantum Cryptography Migration Guide.

Small versus large organisations: a small organisation using mainstream cloud and SaaS will get most of its migration from suppliers, so its main jobs are inventory, supplier questions and keeping software current. A large organisation with its own PKI, HSMs, bespoke protocols or OT must run a funded programme now, because the 2031 milestones for high-priority systems leave little time for hardware refresh cycles.

Where machine identities fit

Almost every quantum-vulnerable key in an enterprise belongs to a non-human identity: TLS server and client certificates, workload mTLS identities, SSH host and user keys, code signing keys, SAML and OIDC token signing keys, VPN and IKEv2 credentials and device certificates. That has three practical consequences. First, the certificate and key inventory you need for machine identity governance is the same inventory the NCSC 2028 milestone asks for. Second, shorter certificate lifetimes and automated issuance make the switch to ML-DSA certificates far easier. Third, token signing keys for identity providers need their own plan, because relying parties must accept new algorithms before issuers can switch. See the Post-Quantum Migration for NHIs Guide and the Machine Identity, PKI and Certificate Lifecycle Guide.

Common failure patterns

  • Quoting 2035 as the only date. Plans that aim at 2035 miss the 2027 CNSA 2.0 acquisition rule, the 2030 EU and TLS dates and the 2028 and 2031 NCSC milestones, and then run out of hardware refresh cycles.
  • Treating draft NIST dates as final. IR 8547 and SP 800-131A Rev. 3 were still drafts on 28 October 2026. Write policy that references "the current NIST transition schedule" and review it when the final versions appear.
  • Using commercial parameter sets for NSS work. ML-KEM-768 hybrids are common in browsers, but CNSA 2.0 requires ML-KEM-1024 and ML-DSA-87.
  • Inventory that misses machine identities. Scanning only public TLS endpoints leaves out internal mTLS, SSH keys, code signing and HSM-held keys, which are the hardest to move.
  • Relying on secondary summaries. Vendor blogs often attach dates to the wrong body or invent per-sector deadlines. Every date on this page links to its official source; check that source before citing a date in a board paper.
  • No supplier evidence. The NCSC explicitly asks organisations to tell suppliers their needs. Without contract clauses and roadmaps, you cannot show progress against 2031.

Measuring progress

  • Percentage of cryptographic assets inventoried, split by certificates, keys, protocols and libraries.
  • Percentage of external and internal TLS endpoints on TLS 1.3, and the share negotiating hybrid key exchange.
  • Number of high-priority systems (long data lifetime, critical service) with a funded migration date before 2031.
  • Percentage of strategic suppliers with a published PQC roadmap or contractual commitment.
  • Months between a deadline in this tracker and your planned completion date for the systems it covers (negative means late).

Framework mapping

FrameworkReferenceHow it relates
NIST CSF 2.0ID.AM-02 (software and services inventoried), ID.RA-01 (vulnerabilities identified), PR.DS-01 and PR.DS-02 (data at rest and in transit protected)Inventory and protection of data with long confidentiality lifetimes
NIST SP 800-53 Rev. 5SC-12 Cryptographic Key Establishment and Management, SC-13 Cryptographic Protection, SC-8 Transmission Confidentiality and Integrity, SA-4 Acquisition ProcessAlgorithm choice, key management and procurement clauses
CNSSP 15 with CNSA 2.0NSA CNSA 2.0 algorithms and datesBinding for US national security systems

How to use this tracker

  • Review cadence: this page is reviewed monthly. The status line at the top shows the last check date.
  • What triggers an update: a final IR 8547 or SP 800-131A Rev. 3, the CISA product categories list, a revised NSA CNSA 2.0 advisory, an updated NCSC timeline, or a new EU or national roadmap.
  • How to cite: cite the official source in the references below, not this page, in contracts and policy.

Practitioner checklist

  • Identify which of the bodies above bind you directly, and which reach you through customers or regulators.
  • Record the earliest applicable date for each business unit and plan backwards from it.
  • Complete a cryptographic inventory that includes machine identities, HSMs and code signing.
  • Rank systems by data lifetime and treat anything confidential past 2035 as high priority now.
  • Move to TLS 1.3 and pilot hybrid key exchange with a tested rollback path.
  • Add PQC and crypto-agility clauses to procurement, using CNSA 2.0 parameter sets where NSS work is involved.
  • Track the NIST drafts and update policy references when final versions appear.
  • Report the progress metrics above to the risk committee at least twice a year.

Standards and references

Related NHI Mgmt Group resources: NIST IR 8547 PQC Transition Timeline Guide · Q-Day Planning Guide · Crypto-Agility Guide · Cryptographic Discovery and PQC Readiness Tools Buyer's Guide · Post-Quantum Migration for NHIs Guide. This guide summarises published government and standards body timelines and is not legal advice.

PDF for subscribers

Take this guide with you

Every section, table and checklist in one PDF, with links to the sources and related guides. Subscribe to our weekly NHI & AI Identity Journal and we’ll email you a download link.

Free weekly newsletter

Subscribe to the NHI & AI Identity Journal

The latest on NHI and Agentic AI security – articles, research, breaches, news and events every week.

Bonus 33% off our NHI Course when you subscribe.

NHIMG Editorial Note
Researched and written by the NHI Mgmt Group editorial team using AI tools, under the editorial direction of Lalit Choda. Facts are drawn from the sources listed on this page and checked by our automated quality process. Last updated 28 October 2026. Spotted an error? Use our contact page.
NHI Mgmt Group, the independent authority on Non-Human Identity, IAM and Agentic AI security. nhimg.org

PDF Downloads for Newsletter Subscribers

Get the guide

Enter your details and we’ll email you a download link.

The full guide is free to read online. The PDF is a thank you for subscribing.

Fill in all fields marked * and tick the PDF box to continue.