On this page

NERC CIP-007 is where the day-to-day hygiene of high and medium impact BES Cyber Systems is tested, and its fixed clocks for patch evaluation, log review and password change make it one of the most evidence-heavy standards in the CIP family. The standard covers five requirements: ports and services, security patch management, malicious code prevention, security event monitoring and system access control. This guide works through each requirement part by part, with the time periods as the standard states them, the evidence auditors expect and the places where programmes usually slip. It is written for utility compliance teams and the OT security and operations engineers who produce the evidence. For the wider CIP family, start with the NERC CIP Guide.

Status checked 27 November 2026: CIP-007-6 is the version you are audited against today. FERC Order No. 919, effective 26 May 2026, approved CIP-007-7.1 as part of the virtualisation package; it becomes enforceable under NERC's implementation plan, described below.

Key takeaways

  • Two 35-day clocks drive patching. Part 2.2 requires security patches to be evaluated at least once every 35 calendar days, and Part 2.3 requires each applicable patch to be applied, or a dated mitigation plan created or revised, within 35 calendar days of that evaluation.
  • Logs must be reviewed, not only kept. Part 4.3 requires at least 90 consecutive calendar days of retention for in-scope systems, and Part 4.4 requires a summary or sample of logged events to be reviewed at intervals of no more than 15 calendar days for high impact systems.
  • Every open port needs a documented reason. Part 1.1 allows only logical network-accessible ports the entity has determined are needed, so a port list without a justification is a finding in waiting.
  • Shared and generic accounts are explicitly in scope. Part 5.2 requires an inventory of enabled default and generic account types and Part 5.3 requires you to know who can use each shared account, which is where most service account work lands.
  • Evidence is the deliverable. Retain dated, attributable records for three calendar years, and design patch, logging and account tooling to produce them as a by-product.

Scope and applicability

CIP-007-6 applies to Balancing Authorities, Distribution Providers (for specific protection and restoration systems only), Generator Operators, Generator Owners, Interchange Coordinators or Interchange Authorities, Reliability Coordinators, Transmission Operators and Transmission Owners. Exempt are Cyber Assets at facilities regulated by the Canadian Nuclear Safety Commission, communication links between discrete Electronic Security Perimeters, systems regulated under 10 C.F.R. 73.54 and entities with no high or medium impact BES Cyber Systems. Categorisation under CIP-002 therefore decides everything here; see the NERC CIP-002 BES Cyber System Categorisation Guide.

Each part names its own Applicable Systems, and the differences matter. The table uses H for high impact BES Cyber Systems with their associated EACMS, PACS and PCA, M for medium impact systems with the same associated assets, M-ERC for medium impact with External Routable Connectivity and M-CC for medium impact at Control Centers.

PartObligation in briefApplicable systemsTime period
1.1Enable only needed logical network-accessible portsH, M-ERCNone
1.2Protect against unnecessary physical input/output portsH, M-CC (PCA and nonprogrammable communication components inside both a PSP and an ESP)None
2.1Patch management process, including the sources monitoredH, MNone
2.2Evaluate released security patchesH, MAt least every 35 calendar days
2.3Apply, or create or revise a dated mitigation planH, MWithin 35 calendar days of evaluation
2.4Implement mitigation plans within their timeframeH, MAs set in the plan
3.1 to 3.3Deter, detect or prevent malicious code; mitigate detections; update signaturesH, MNone
4.1Log security events, with three minimum event typesH, MNone
4.2Alert on malicious code and on logging failureH, M-ERCNone
4.3Retain event logsH, M-CCAt least 90 consecutive calendar days
4.4Review a summary or sample of logsHigh impact BES Cyber Systems with associated EACMS and PCANo more than 15 calendar days between reviews
5.1Enforce authentication of interactive user accessH, M-CC, M-ERCNone
5.2 to 5.4Inventory default and generic accounts; know shared account users; change default passwordsH, M (5.3: H, M-ERC)None
5.5Password length and complexityH, MNone
5.6Password change or obligation to changeH, M-ERCAt least every 15 calendar months
5.7Limit or alert on unsuccessful authentication attemptsH, M-CCNone

What changes with CIP-007-7.1

FERC Order No. 919 approved eleven modified CIP standards, including CIP-007-7.1, with the rule effective 26 May 2026. The ".1" marks errata corrections to CIP-007-7, which the NERC Board adopted on 9 May 2024. NERC's implementation plan sets the effective date as the later of 1 April 2026 or the first day of the first calendar quarter that is 24 months after the effective date of the approving order, which we read as 1 July 2028 (the order states no fixed date), with optional early adoption at six, 12 or 18 months by notifying your Regional Entity. Confirm the date with your Regional Entity.

In the CIP-007-7 text, every table gains a row for SCI (Shared Cyber Infrastructure) supporting an Applicable System. Part 1.1 becomes a requirement to disable or prevent unneeded routable protocol network accessibility "per system capability", replacing the technical feasibility wording. A new Part 1.3 requires SCI supporting high or medium impact systems to prevent CPU and memory sharing, excluding storage, between virtual Cyber Assets that belong to those systems and virtual Cyber Assets that do not. The 35-day patch clocks, 90-day log retention, 15-day log review and 15-month password change are unchanged.

R1 Ports and services

Requirement R1 reduces the attack surface. Part 1.1 requires that, where technically feasible, only logical network-accessible ports the entity has determined are needed are enabled, including port ranges or services needed for dynamic ports. Where a device has no way to disable ports, its open ports are deemed needed.

  • Build a justified baseline: for each Cyber Asset or asset type, list listening ports and services, the business or operational need for each, and who approved it.
  • Prove what is actually open: the standard's measures accept configuration files, command output such as netstat, network scans of in-scope assets, or host firewall rules that allow only the needed ports. Compare observed ports to the justified list on a schedule, not only at audit time.
  • Physical ports (Part 1.2): protect unused USB, serial, console and network jacks used for connectivity, console commands or Removable Media. Logical controls (disabling in BIOS or by policy) and physical controls (port locks, signage) are both acceptable.

R2 Security patch management

R2 clocks run continuously across every applicable Cyber Asset, including firewalls, EACMS jump hosts, PACS controllers and vendor appliances. The process is detailed in the OT Patch Management Guide; this section covers what CIP-007 specifically demands.

  1. Identify sources (Part 2.1): for each installed product, name the source you monitor for security patches: the vendor's advisory page, the vendor portal or an integrator. Where a product has no source because it is unsupported, record that explicitly; an asset with no patch source is still in scope.
  2. Evaluate on the 35-day cycle (Part 2.2): at least once every 35 calendar days, evaluate security patches released since the last evaluation for applicability. Record the date, the sources checked, each patch found and the decision. A month with no new patches still needs a dated record saying so.
  3. Act within 35 days of evaluation (Part 2.3): for each applicable patch, apply it, create a dated mitigation plan, or revise an existing plan. A mitigation plan must state the planned actions to mitigate the vulnerability and a timeframe to complete them.
  4. Deliver the plan (Part 2.4): implement each plan within its timeframe. Extensions or revisions need approval by the CIP Senior Manager or a delegate, recorded before the original date passes.

The two clocks are consecutive, so a patch evaluated late in one cycle can reach its action deadline almost 70 days after release. That is a ceiling, not a target. Severity tiers in the standard escalate with lateness, starting once an evaluation or action passes 35 days, so a missed cycle by a few days is already a violation. For triage of ICS advisories and compensating measures while a patch waits for a maintenance window, see the ICS Advisory Triage and OT Vulnerability Management Guide.

R3 Malicious code prevention

R3 is deliberately technology-neutral. Part 3.1 requires methods to deter, detect or prevent malicious code; Part 3.2 requires the threat of detected malicious code to be mitigated; Part 3.3 requires, for signature or pattern-based methods, a process to update the signatures that addresses testing and installing them.

MethodFits bestEvidence to keep
Antivirus or EDR with signaturesWindows HMIs, historians, EACMS jump hostsAgent coverage report, update test and install records (Part 3.3), detection and response tickets
Application allowlistingStatic control system hosts where vendors restrict agentsPolicy configuration, enforcement mode status, blocked execution logs
System hardening and restricted mediaEmbedded devices, relays, appliances that cannot run softwareHardening documentation, Part 1.2 port protection, transient asset controls
Network-based detectionSegments with devices that accept no host agentSensor coverage, rule update records, alert handling

Check vendor support statements before deploying agents on control system hosts. See the Application Allowlisting Guide for static hosts.

R4 Security event monitoring

Part 4.1 requires logging, at the system or device level, of events needed to identify and investigate Cyber Security Incidents, including at minimum successful login attempts, failed access and failed login attempts, and detected malicious code. Part 4.2 requires alerts for security events the entity decides need them, including at minimum detected malicious code and a detected failure of Part 4.1 logging.

  • Retention (Part 4.3): where technically feasible, keep Part 4.1 logs for at least the last 90 consecutive calendar days, except during CIP Exceptional Circumstances. Prove it with configuration screenshots and a sample of the oldest retained records, not only a policy statement.
  • Review (Part 4.4): review a summary or sampling of logged events, as the entity determines, at intervals of no more than 15 calendar days, to find undetected Cyber Security Incidents. Keep the dated review record, the scope sampled and any follow-up.
  • Logging failure alerts: the alert for failed logging is the one most often missing. Monitor for silent sources in your SIEM or log collector so a dead forwarder raises an alert within hours.

For wider log design, see the CIS Control 8 Audit Log Management Guide. Network traffic monitoring inside the perimeter is a separate obligation under the NERC CIP-015 Internal Network Security Monitoring Guide.

R5 System access control

R5 is the identity heart of CIP-007, and it reaches well beyond human logins: vendor default accounts, application accounts and shared administrator credentials on appliances all fall under it. Access authorisation and revocation sit in CIP-004; see the NERC CIP-004 Guide: Personnel Risk Assessment, Training and Access Revocation.

PartControlPractical implementation
5.1Method to enforce authentication of interactive user access, where technically feasibleCentral directory authentication on hosts, local authentication on devices, documented per asset type
5.2Identify and inventory all known enabled default or other generic account types, by system, group, location or system typeAccount discovery per platform, including vendor service and maintenance accounts
5.3Identify individuals who have authorised access to shared accountsNamed list per shared account, tied to CIP-004 authorisation records; a password vault checkout log helps
5.4Change known default passwords, per Cyber Asset capabilityCommissioning checklist step, or vendor documentation that devices ship with unique pseudo-random passwords
5.5For password-only access: length of at least the lesser of eight characters or the maximum the asset supports; at least the lesser of three or more character types or the maximum supportedTechnical enforcement where possible, procedural enforcement with attestation where not
5.6Where technically feasible, password change or an obligation to change at least once every 15 calendar monthsExpiry policy, or a tracked rotation schedule for shared and service credentials
5.7Where technically feasible, limit unsuccessful authentication attempts or generate alerts after a thresholdLockout where safe; alerting instead on operator consoles where lockout could affect operations

Where identity fits

Service and generic accounts are the weak point of most R5 programmes. A historian's database account or a vendor maintenance login is often shared, rarely changed and absent from directory reviews. Treat each as a non-human identity with a named owner, a documented purpose, a vaulted credential and a rotation date inside the 15-month window, and confirm that the CIP-004 shared account password change after a departure is triggered by the same records. The How to assign owners to orphaned service accounts guide covers the ownership step, and the Default Credential Breaches Lessons Guide shows why Part 5.4 matters.

Audit evidence and common findings

The standard requires evidence of compliance to be retained for three calendar years unless the Compliance Enforcement Authority directs otherwise, and longer where a non-compliance is being mitigated.

RequirementCore evidenceCommon finding
R1Justified port lists, scan or netstat output, physical port protection recordsPorts open on a scan that are absent from the justification, often after a vendor upgrade
R2Source list, dated evaluations every cycle, installation records, approved mitigation plansA missed or late evaluation for one product family; mitigation plans extended without prior approval
R3Coverage reports, signature test and install records, detection handlingAssets without any method recorded; signature updates installed without the documented test step
R4Logged event types, alert configuration, retention proof, dated 15-day reviewsA gap of more than 15 days between reviews over a holiday period; no alert for logging failure
R5Account inventories, shared account user lists, password settings, lockout or alert configurationUndiscovered vendor default accounts; shared credentials older than 15 calendar months

Implementation sequence

  1. Confirm scope: reconcile the CIP-002 list with the asset inventory, including EACMS, PACS and PCA, and record each asset's applicable parts.
  2. Automate the clocks: put the 35-day evaluation, 35-day action, 15-day review and 15-month rotation dates into a tracked calendar with alerts at 25, 30 and 33 days, so slips surface before they become violations.
  3. Pilot on one site: run the full evidence set for one substation or control centre through an internal mock audit before scaling.
  4. Measure: track the share of patch evaluations completed within 35 days, open mitigation plans past their timeframe, the longest interval between log reviews, assets without a malicious code method, and shared accounts with a credential older than 12 months.
  5. Plan for CIP-007-7.1: inventory hypervisors and shared infrastructure that will become SCI and test Part 1.3 isolation evidence before the effective date.

Framework mapping

CIP-007 requirementNIST SP 800-53 Rev 5NIST CSF 2.0
R1 Ports and servicesCM-7 Least FunctionalityPR.PS-01 (configuration management)
R2 Patch managementSI-2 Flaw RemediationID.RA-01, PR.PS-02
R3 Malicious codeSI-3 Malicious Code ProtectionPR.PS-05, DE.CM-09
R4 Event monitoringAU-2, AU-6, AU-11, AU-12PR.PS-04, DE.CM-09
R5 Access controlAC-2, AC-7, IA-5PR.AA-01

Practitioner checklist

  • Every in-scope Cyber Asset, including EACMS, PACS and PCA, is mapped to the CIP-007 parts that apply to it.
  • Each enabled logical port has a recorded need and approver, and observed ports are compared to that list on a schedule.
  • Every installed product has a named patch source, and a dated evaluation exists for every 35-day cycle, including cycles with no new patches.
  • Each applicable patch is installed or covered by a dated mitigation plan within 35 days of evaluation, and extensions carry prior CIP Senior Manager or delegate approval.
  • Every asset has a recorded malicious code method, and signature updates follow a documented test and install process.
  • Logs for in-scope systems are retained for at least 90 consecutive days, an alert fires on logging failure, and dated reviews never exceed 15 days apart.
  • Default and generic accounts are inventoried per platform, each shared account has a named list of authorised individuals, and default passwords are changed at commissioning.
  • Shared and service credentials are vaulted with an owner and rotated inside 15 calendar months.
  • Evidence is filed by requirement part and asset and kept for three calendar years.
  • A dated plan exists for CIP-007-7.1, covering SCI inventory and Part 1.3 isolation evidence.

Standards and references

This guide summarises NERC CIP-007 and is not legal advice. Confirm obligations against the current standard and with your Regional Entity. Related NHI Mgmt Group resources: NERC CIP Guide, NERC CIP-013, OT Security Guide, NIST SP 800-82 OT Security Guide.

PDF for subscribers

Take this guide with you

Every section, table and checklist in one PDF, with links to the sources and related guides. Subscribe to our weekly NHI & AI Identity Journal and we’ll email you a download link.

Free weekly newsletter

Subscribe to the NHI & AI Identity Journal

The latest on NHI and Agentic AI security – articles, research, breaches, news and events every week.

Bonus 33% off our NHI Course when you subscribe.

PDF Downloads for Newsletter Subscribers

Get the guide

Enter your details and we’ll email you a download link.

The full guide is free to read online. The PDF is a thank you for subscribing.

Fill in all fields marked * and tick both boxes to continue.